Draft:

Present: Gunn, Miguel, Olivier, Frederic, Miguel

Link to previous meeting: https://indico.cern.ch/event/1439584/

Discussion:

  • For the EYETS 24-25, the water manifold on the ring (for magnet and timepix) will be modified to add additional ports/pipes
  • Since this is a monor work, integration is not needed.
  • Clarify with magnet team (D. Bodart), prepare a simple sketch (PID diagram) that gives number of ports needed, at the moment there are 4 in and 4 out for the 4 magnets on the left side of Point4 (the sane on the right of Point4). During last discussion it was decided that we keep cooling circuit for magnet seperate from the timepix after the manifold.
  • For the power converters, which will come in LS3, the work can be done after the YETS24-25, to be followed up
  • Keep A. Marion in loop for all the comunications
  • VIC visit for EN-CV work is organised for TS2 on 22 Oct 2024 by A. Marion, but this is probably only for the tunnel, can we combine this with the VIC visit for the power converter cooling work ?

 

Update (cooling water PID sketch by D Bodart):

There are minutes attached to this event. Show them.
    • 14:30 14:50
      Followup, status update and intergartion 20m
      Speakers: Frederic Borralho (CERN), Gunn Khatri (CERN), James Storey (CERN), Miguel Navarro Baeza (CERN), Olivier Crespo-Lopez (CERN)