Production and PASTE Meeting, 3rd April 2007, CERN
Chair: A.Tsaregorodtsev
Minutes: S. Paterson
CERN: G.Castellani, J.Closier, A.Smith, S.Paterson, R.Santinelli
Phone: R.Bernet, N.Brook, G.Kuznetsov, U.Marconi, M.A.S.Miguelez, R.Nandakumar, A.Tsaregorodtsev
Apologies: M.Bargiotti, P.Charpentier
1. Production Status Report ( J.Closier )
Minutes from the Monday meeting are available
here. Joel reported that due to the power interventions
at PIC we are currently 'blind'. In the future it was agreed to put a backup mirror of the monitoring pages at another
site. Another suggestion was to develop a shell-based monitoring overview which will be pursued with lower priority.
In the short term, Marcos offered to put a temporary monitoring webpage in place at USC. ( ACTION: Marcos )
2. Production Operations Issues
- Stager agent and data access status
Stuart reported that the Stager is working fine at all sites. Several sites have now successfully run stripping and
reconstruction jobs. There was a long discussion regarding the possible causes of the problems at NIKHEF.
Subsequent emails have clarified that two problems existed. Firstly gPlazma at SARA was not configured properly to
reflect the desired mapping of FQANs to uids/gids (now fixed). The second problem involved an error in the grid map
file causing every LHCb user to be mapped to one uid, also now resolved. It was agreed to try to use Joel or Raja's
certificate in production over the weekend, requiring a small change to the Agent Director on volhcb02. Tests should
be made to confirm this works. ( ACTION: Stuart )
- Data accumulation at CERN and T1 redistribution
The plan to accumulate data at CERN and scrap at Tier-1 sites is underway. The list from Marianne was incorrectly
compiled for FTS job submission (too many entries for RAL and PIC in the list of replicas). Roberto volunteered to
contact Marianne and build the FTS jobs. ( ACTION: Marianne, Roberto )
- Storage and File Catalog clean-up, file removal status ( Marianne absent )
- Investigation of the zero size files registered in LFC
Andrew conveyed that his agent can locate and resolve zero size files which have no replicas. There are several cases
to consider. If the replicas are of zero size either the transfer could have failed or a zero size file was uploaded. If the
transfers succeeded, the LFC registration could have failed. The agent is now running and Andrew will report next
week on the progress. ( ACTION: Andrew )
- Proxy handling status
Gianluca confirmed that the job receiver now checks the type of proxy with which a job is submitted and will extend
this to a default .lhcb VOMS proxy if necessary. It was suggested that the extension should be made based on the
original role of the flat proxy. ( ACTION: Gianluca ) The current renewal mechanism will extend a Grid proxy to a Grid
proxy, this should be changed to a VOMS proxy. ( ACTION: Gianluca ) Stuart mentioned that although this is
expected to be a transparent switch for Ganga users, they should be informed when it occurs.
- CS slaves at VO-boxes
Raja reported that port 9131 is open on all the VO-boxes and it was discovered during the meeting that the CS slaves
are correctly publishing themselves.
- User system migration to volhcb01
Andrei reported that the services are deployed on volhcb01 and we can proceed with the migration of the user
system. Stuart suggested waiting for Gianluca's fixes before proceeding with the migration such that we have a
consistent treatment of VOMS proxies in the WMS, this was agreed.
3. DIRAC3 Tasks
- Framework and Databases status
Andrei confirmed that the mySQL base class was working. The database definitions have been implemented as
discussed at the last PASTE meeting. The changes to the production repository are to be presented in the next two
weeks. ( ACTION: Gennady )
- Building tools status
Due to the intensive debugging of the reconstruction and stripping jobs, Joel has made no progress with the build
tools. There was some discussion over the inclusion of Python in the DIRAC CVS repository with Andrei noting that for
SLC3/4 we can pick up the required version from the LCG Applications Area. For more exotic platforms it is not clear
how distributions could be built. It was agreed to discuss the issue at the next PASTE meeting with Ricardo.
- Setting up lxgate14 for DIRAC3
lxgate14 is now completely free of DIRAC services. The installation of SLC4 and upgrade of the LCG UI etc. for
DIRAC3 can now be started.
4. AOB
None
There are minutes attached to this event.
Show them.