Goal: Identifying events ( or series of events) where safety measures or systems fail to perform as expected, potentially causing harm, injury or damage (significant repair costs and/or operational downtime)

 

Zoom Meeting ID
68038109843
Host
Melania Averna
Useful links
Join via phone
Zoom URL
    • 11:30 11:40
      Introduction 10m

      Split the installation: underground and above ground

      Speaker: Melania Averna (CERN)
    • 11:40 12:10
      TCC8 30m

      1 Access mode-> people present in TCC8 ( how many?)

      Ventilation stop ( failure or power cut)

      ()AHUs 20000 m3/h
      ()extraction: XXXXXm3/h - 1ACH c.ca -> Action F. Dragoni
      ()heat gain to be assessed
      no RP concerns if ventilation is lost

      To be assessed:

      Evacuation time -> Melania to check with PESS and Fire Brigade
      -Upon confirmed gas detection
      -Upon confirmed Fire detection
      -Manual call point ( evac and BIW)

      Current design
      Future design

      2 Operation

      Heat Gain: it should not change from the figure for access mode
      Head load in the target complex to be assessed (JLG)

      Any temperature and humidity control required? To be checked with all project team on monday

      Current design for the airlock; dedicated - HEPA- filter and fan (duty stand by)
      () interlocks logic - to be confirmed with Jani L.

    • 12:10 12:25
      ECN3 15m

      ECN3: 30000m3/h
      mainly in recirculation

      Galleries: scenario to be confirmed

    • 12:25 12:30
      Way forward 5m

      To be discussed:

      Failure of the new target complex cooling system - > stop operation

      Target Complex as a whole: FIRIA