Specification of aperture/GFR:

  • 24 mm needed for GFR (+-12mm)
  • conservatively should assume 36 mm for aperture
  • tbd what dimensions for vacuum chamber, alignement, distance chamber/pole for eddy currents
  • Pablo will update the EDMS doc
  •  

Conventional magnets

  • cost update re industrialization process and learning curve

 

Permanent magnets

  • design now for .2 T tuning range via mechanical shunts 0.14 - 0.24 T --> overall can assume +/-20% tuning range possible, change would need several weeks
  • Pierre will update for 0.4 T and sagitta

 

Discussion on baseline choice between PM and EMs to be organzied by Wolfgang

 

from today's discussion items for future studies, list non exhaustive:

  • error studies leading to confirming/modifying field tolerances
  • temperature in tunnel and stability
  • vacuum chamber design (material, thickness, eddy currents, mechanical stability, wall impedance,...)