Notes from HI-ECN3 - BDF Magnetised Hadron Stopper (MHS) Discussion with TE-MSC
- Clear motivation from (i) target design optimisation and (ii) sc options for muon shield to study a shorter MHS of length 2.5 m with as high a field as reasonable achievable (> 1.8 T)
- Action: Matt to collect info from Claudia/JL/Rui and SHiP and update FS
- A water-cooled copper design with organic insulator looks suited and makes connecting to the existing magnet cooling circuit (K12 being dismantled)
- A dual coil design looks promising for redundancy:
- Details of the location of the redundant coil to be studied as part of
- Energy efficiency does not look to be so important for the design -> up tot about 5 kW in DC
- Add the following points to the FS and circulate on EDMS:
- MHS is NOT in vacuum
- Lifting capacity of 30t of crane
- Importance of establishing the assembly / disassembly procedure with final dismantling in mind
- Action: Matt
- MHS budget: 1250 MCHF as part of WP4
- Coil(s)
- Yoke material (SS/iron?)
- Services (connections/piping)
- Conceptual / mechanical / integration design work linked to WP4
- Timeline:
- TDR to be published early 2026: Action Matt to contact editorial team
- Final design detailed enough to allow integration studies to be completed (WP4)
- Cost & schedule needed for MTP26
- BC for MHS to be provided to TE-MSC via WP4: