Crab Cryomodule Technical Meeting TRIUMF/CERN

Europe/Zurich
Simon Barrière (CERN)
    • 16:30 16:45
      Survey equipment 15m
      Speakers: Mateusz Sosin (CERN), Vivien Rude (CERN)
    • 16:45 17:05
      Design/Fabrication updates 20m

      Questions for team meeting
      - Q1. Related to the question on the material for the cavity support structure LHCACFAH0101. We would like to substitute C93700 "highly leaded tin bronze" with C93600(C93700 modified). We would like to substitute C52100 "8% phosphor bronze" with C54600 "Aluminum bronze"
      Q2. Copper Braid material. Copper braid as part of the thermal screen LHCACFTS0460 is specified as C110 ETP and Braid as part of the thermal intercepts LHCACFTS0518 is specified as C101 OFC. Due to the availability of braid in C110 we would like to purchase all braid from C110.
      - Q3: Status of latest SS316LN requested material
      - Q4: Status of equipment for cavity test – rf adaptors
      - Q5: Status of TCM0 string equipment – RF space PIMS, vacuum equipment, and FPC
      - Q6: Status of TCM1 build equipment
      o string full set of equipment, 2FPCs
      o CM build parts including thermal screen tubing, tuner in vacuum parts, cryo instrumentation, FSI equipment, other CERN scope
      - Q7: Status of out of scope production for series

    • 17:05 17:20
      AOB 15m