Exceptional FP420 meeting

Europe/Zurich
    • 1
      Intro and Communications
      Speaker: Albert and Brian
    • Alignment system - considerations after the BPM workshop 40-R-A10

      40-R-A10

    • 2
      Highlights for the BPM meeting and FP420 Stategy
      Speaker: Detlef and Jo
    • 3
      Support table - a proposal
      Speaker: Mimmo
      Slides
    • 10:35
      break
    • 4
      Discussion on Alignment
    • 5
      Outline- present and missing contributions
      Speaker: Albert and Brian
    • TDR Status
    • 6
      Discussion on TDR
    • 12:30
      break
    • 7
      Intro and schedule
      Speaker: Cinzia
    • Test beam status 40-S2-B01

      40-S2-B01

    • 8
      Status of silicon modules
      Speaker: Scott and Ray
    • 9
      status of timing detectors
      Speaker: Abdrew; Mike; Krzysztof
    • 10
      Status of Hamburg pipe
      Speaker: Krzysztof
    • 11
      Common DAQ
      Speaker: Scott
    • 15:30
      break
    • 12
      Definition of dimensions
    • Detector mechanics
    • 13
      Listing the required drawings
      Speaker: All
    • 14
      Latest on services
      Speaker: Henning
      Slides
    • Collaboration Board 40-R-A10

      40-R-A10