Activity of the Month

Europe/Zurich
    • Domenico Vicinanza
      Domenico Vicinanza April, 2007 Major work for EUMEDGRID; major changes in workplan ---------------------------------------------------------------- - SAM Server mainainance (Oracle Express) for the EUMEDGRID installation in Malta. - SAM Client upgrade and mainatinance: -- Sensors updated to latest release (version 1.2.1). -- Fixing problems due to new CERN certificate structure - Started working at MEDIAN proposal - Prepared two storyboard for two EUMEDGRID applications demostration videos (CODESA-3D and Archaeogrid-MM5), to be uploaded on the website and used for dissemination activities Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- - SAM Test integration: ALICE Experiment VOBOX test integration: fixing some problems related to new CERN certificate (Authentication failure on SAM portal) - SAM Documentation: -- SAM Manuals are available on http://cern.ch/sam-docs in both PDF and HTML formats. -- A build script for the documentation was written to automatically build all the documents and publish them on the web. -- SAM tests and sensors sources documentation, automatically generated by TIC (Crakow), was integrated into SAM Manuals as a separate document (not yet integrated into the sam-docs portal). -- All the sources of SAM Manuals together with the build script were stored in CVS Major events attended (include links to event/presentation) --------------------- SAM Team and IT-GD-OPS weekly meetings Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- HPDC Meeting in Monterey Bay in June Holidays during the period ------------------------------------------------------------ 1 day TimeSheet for the month ------------------------------------------------------------ WP3/A3.2 and 3.3 65% WP4/A4.2 and 4.3 35% Infrastructure status ------------------------------------------------------------ # of sites in project: 12 (10 Countries, 8 Mediterranean Countries) # of sites contributing to the EGEE production infrastructure: # of CPUs: 530 total SE: 13 total CE: 14 total gCE: 2 total RB: 7 total FTS: 0 total LFC: 2 total Local LFC: 0 ************************************************************
    • 1
      Roberta Faggian Marque
      DILIGENT * Planning for FP7 * Planning for next review in Manchester * TCom meeting in Rome (1 week) * Preparation for the User focumL: posters/demo/presentation * participation to release candidate beta phone conference RPLO * reviewed Review slides * follow-up with Linga of several updates EGE-RP * new FP7 proposals preparation (in particular Part B of D4Science: Service Activities) * budget calculations, A2 submissions * (D4Science, ICEAGE2, EELA2, MEDIAN, SEEGRID-SCI, BG4Science, MG+LA, EGI, ETICS) HOLIDAYS * 1 week in Venice TRAVEL * EGEE user forum
    • 2
      Pedro Andrade
      WP1.2 (0.5) - support to DILIGENT partners on gLite technical issues WP1.7 (0.5) - support to 4DSOFT in the deployment of the DILIGENT services WP1.8 (13.5) - participation in release beta phone meeting - discussions with ETICS team and submission of ETICS bugs - installation and update of the deployment testing infrastructure - update of the deployment test tool for release Beta - execution of deployment testing on integration build 0.2.3 - execution of deployment testing on integration build 0.2.4 - execution of deployment testing on integration build 0.2.5 - execution of deployment testing on integration build 0.2.6 WP3.1 (0.5) - distribution of information about access to PPS WP4.2 (0) WP4.3 (0) Other (6) - participation to TCom meeting in Rome - participation to TCom phone meeting - OpenLab student selection - review of D4Science proposal - IT/EGE retreat Holidays (0) Last Update - 03 may
    • 3
      Karin Burghauser
      Minutes
    • 4
      Dusan Vudragovic
      ToC
      Dusan Vudragovic April, 2007 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- - SEE-GRID operational tool that provides web interface to the content of BDIIs – WiatG? - Improving scalability of WiatG? - Imports EGEE related project BDIIs to WiatG? - SEE-GRID SAM support - Creating and distributing ToC for D3.1a Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- - ROC on duty for one week - SAM support for one week - GOC Wiki SiteProblemsFollowUpFaq pages updates Major events attended (include links to event/presentation) --------------------- - WLCG-OSG-EGEE Operations meeting (April 16) - SAM weekly meetings - IT-GD-OPD weekly meetings Holidays during the period ------------------------------------------------------------ 4 days TimeSheet for the month ------------------------------------------------------------ WP3 A3.1 100% Infrastructure status ------------------------------------------------------------ 30 of sites in project 10 of sites contributing to the EGEE production infrastructure 854 of cpus 20.85TB total SE
    • Lanxin Ma
      Lanxin Ma Apr. 2007 Major work for ; major changes in workplan ---------------------------------------------------------------- 1. EUChina SAM Server maintance 2. EUChina SAM clients(in cnaf & in IHEP) upgrade & maintance 3. Ticket system, investicate & solve EUChina sites problem 4. 2nd voms maintenance 5. Give trainning to chinese admins of SAM & 2nd voms. Write EUChina SAM & 2nd voms installation and configuration guide. Help chinese admin of SAM to setup SAM clients in IHEP. Major work for ; major changes in workplan --------------------------------------------------------------- 1. VOMRS/VOMS maintenance & troubleshooting 2. VOMRS user support, Process user's requests, problems & tickets 3. Test vomrs-1.3-1 with new voms-admin-2.0-3 with SLC3 new features(voms GA & vomrs/vomrs with oracle oci driver) vomrs bug fixes 4. Apply server accounts and certificates 5. PPS top level BDII maintance & upgrade Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- EMT weekly meeting for vomrs/voms new version IT-GD-OPS weekly meeting Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 0 days TimeSheet for the month ------------------------------------------------------------ WP3/A3.3 100% Infrastructure status ------------------------------------------------------------ 10 of sites in project 10 of sites contributing to the EGEE production infrastructure 1181 of total cpus total SE: 9 total RB: 7 total FTS: 0 total LFC: 1 total Local LFC: 1 total GridICE: 10 ************************************************************
    • 5
      Alexandre Duarte
      Paper
      Alexandre Duarte April, 2007 Major work for EELA; major changes in workplan ---------------------------------------------------------------- * Work on the Proposal for the EELA 2 Project (JRA1 and SA1) * SAM Maintenance * EELA Grid Operation * Support the installation of an EELA site at UFCG/Brazil Major work for GD-OPS major changes in workplan ---------------------------------------------------------------- * ROC on Duty ( the 2nd to the 6th of April) * Working on the Certification of the McGill University site. * Finished and submitted the final version of the paper about SAm to HPDC. * Started to refactor the bdii2oracle.py script * Working on a new documentation about joining the grid for the ROC CERN Major issues arising -------------------- P.A. contract extended till December/2007. Major events attended (include links to event/presentation) --------------------- Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 0 TimeSheet for the month ------------------------------------------------------------ WP2/T2.1 50% WP2/T2.3.1 30% WP2/T2.3.2 20% Wp4/T4.2: 0% Infrastructure status ------------------------------------------------------------ # of sites in project - 15 # of cpus - 658 total SE 62.5 TB ************************************************************
    • 6
      Florida Estrella
      EUChinaGrid Update A34 survey document, followup some countries Followup EUChina2 PoW Lanxin Update answers to reviewers document, sent to Federico, PO Update forecast PMs, budget, file sent to Marta Booking FE Beijing conf & meeting EGEE dissemination materials to Peking Univ, Sijin Qian EGEE dissemination materials for EUChina-ECHOGrid conf to Stephanie Parker EUMEDGRID/MEDIAN Sent CERN in MEDIAN proposal to Federico SEEGRID2 D31b ToC Sent CERN in SG-SCI proposal to Ognjen, Valia BalticGrid Dissemination March questionnaire sent to R Pajak Dissemination input for BG2 sent to Zofia Booking Rolandas AHM Tallinn FP7 tconf 11.04 Sent suggestions re BG SS to Zofia incl url of EUMed app port school, suggest HeC Konstantin talk at BGSS Sent CERN in BG4Science proposal to Per Health-e-Child PMT Tconf 20.04 CERN FP7 proposals AOM Feb done AOM Mar done All TSs submitted except EELA, EUMed, EUChina RPLO meeting 16.04 EGEE EGEE07 RP track preparation meeting 18.04 Update ISGC minutes, doc from Min - sent to Anna, Bob
    • Konstantin Skaburskas
      notes-procedures
      Konstantin Skaburskas April, 2007 Major work for Health-e-Child; major changes in workplan ---------------------------------------------------------------- - AMGA deployment to test DBs federation (hec-maat-server4.cern.ch) - AMGA test found bugs (still there) - Preparation of inst/conf procedures and CD/DVD images for hospitals (attached as "notes-procedures") - Update to HeC repository with HeC packages - Populated SVN structure for WP5/WP14 deployment - External firewall requests (cern.netops) and tunning (myself) for Maat HeC servers running HeC services at CERN Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- - GMOD (2-3 April) - PPS team coordination meeting - Prepare FTS/FTS for migration 1.5 -> 2.0 - Help to GD-ITR team member (Ljudmila) with WM tests Major issues arising -------------------- - Major events attended (include links to event/presentation) --------------------- - HeC A4 Phone Conference (April, 30th) Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- - Holidays during the period ------------------------------------------------------------ * days 0 *TimeSheet for the month *16* ------------------------------------------------------------ WP5/T5.1 --% (1-6 M) DoWI WP5/T5.2 05% (1-9 M) (13-30 M) WP5/T5.3 --% (7-12 M) DoWI WP5/T5.4 --% (10-15 M) DoWI WP5/T5.5 --% (16-18 M) DoWI WP5/T5.6 60% (13-30 M) WP5/T5.7 --% (18-30 M) WP5/T5.8 --% (18-30 M) WP5/T5.9 00% (13-30 M) WP14/T14.1 10% (13-30 M) WP14/T14.2 25% (13-30 M) WP14/T14.3 --% (18-30 M) CERN 0% WP14/T14.4 --% (13-30 M) CERN 0% WP14/T14.5 --% (18-30 M) WP14/T14.6 --% (18-30 M) WP14/T14.7 --% (18-30 M) WP14/T14.8 --% (18-30 M) CERN 0% WP14/T14.9 --% (18-30 M) CERN 0%
    • 7
      Marc Ozonne
      APRIL 2007 ICEAGE WP3: ISSGC07 Review the ISSGC07's prerequesite exercises GRID IN A BOX Continued to work on the network configuration OTHERS Selected a student in the frame of the "OpenLab Student" program SEMINARS Tue 24th, Wed 25th: " Communicating Effectively" Frid 20th, 27th: Oral english courses LEGAL HOLIDAY Fri 6th, Mon 9th HOLIDAY From Tue 10th to Fri 13th
    • 8
      Rolandas Naujikas
      Rolandas Naujikas 04, 2007 Major work for BalticGrid; major changes in workplan ---------------------------------------------------------------- SAM maintenance. Cluster VU-MIF-LCG2 updates. BAT install and configuration on VU-MIF-LCG2 cluster grid2.mif.vu.lt. Added SDJ support in VU-MIF-LCG2 clusters. Preparation for SAM install at VU-MIF-LCG2. Investigation on proxy renewal problems. Major work for ; major changes in workplan ---------------------------------------------------------------- PPS upgrades. SMOD for CERN-PROD lcg-RB/glite-WMS 3.0/3.1 (for 1 week). Major issues arising -------------------- Proxy renewal problems. Major events attended (include links to event/presentation) --------------------- none Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Preparation for 3AHM in Tallinn. Holidays during the period ------------------------------------------------------------ none TimeSheet for the month ------------------------------------------------------------ NA2: 0% NA3: 0% SA1: Task2: Core central grid services: 20% Task5: User support system: 30% Task7: Logging and accounting system: 30% Task8: Validation and certification of production sites: 20% Infrastructure status ------------------------------------------------------------ 26 sites in project 14 sites contributing to the EGEE production infrastructure 850 cpus (average) 45TB of SE