IBDRS Technical room
Presents: A.Boucherie, J.Molina, M-A.Denis, P.Gallay, L.Solis, F.Pozzi, N.Szczepanik, G.Michet. S.Marzari
· Presentation of the new Technical room localisation on top of the access gallery
· The room 25m2 is too small, Stefano present 2 variants for increasing it to 35m2
· For Fabio version 1 or 2 are RP point of view more or less similar, in case we can add some shielding out of the 738 , after the meeting, Fabio ask if it's possible to increase it in direction of Geneva instead ?
o => to be checked with SCE Martin
· Concerning the new requests, EL needs to know the additional power we need for :
o Vacuum Racks (action Abel)
o Air cooling unit (action Nina)
o Telecom (Marc-Antoine)
· In all cases, we must foresee enough scabbards to be able to pass new cablings in future, it's already planed in the IRP
· Marc-Antoine et Jose prefers to have Racks IT star point and Telecom adjacent:
· Marc-Antoine needs "réseau secouru" for Telecom
· Marc-Antoine needs to know the additional cost of room extension (action Martin)
· Guillaume accepts to share the RP rack with Christophe M. in case the connection to 197 building is too difficult, to be discussed (action Stefano)
· Verify the size of the EL cabinet in function of the new requests (action Patrick)
· Nina needs a reservation outside for the heat exchanger, she will send the dimensions (action Nina)
· 
· Fabio advice to have the feedthrough towards the ground gallery as far as possible to the beam axle
· 
· Stefano ask each stakeholder to check fill the table with pertinent information, especially the number or IT connections needed for each rack / cabinet (action all)
Best regards, Stefano and Antoine
New meeting 21.02.2025 with SCE: M.Manfredi, G.Cnudde, J.Dauge, and STI: AP.Bernardes, F.Pozzi and Stefano
- presentation by Stefano 2 variants of increasing the Technical room to 35 m2

- Variant 1: discarded !

- Variant 2: st1A09019_01

- after discussion the Variant 2 is choosed by SCE
- SCE will do the modification of the building with Variant 2 and reservations for electrical feedthroughs (action Johan)
- ask EN-HE if the yellow rack is monoblock for handling (action Stefano)
- increase the room high to 2800mm and door to 2300mm (action Johan)
- Three layers of cable trays will pass into the acess gallery 736
- ask Didier Chabuis (access) if end zone door ground level can be also the access door (action Stefano)

Kind regards, Stefano