Integration of chiller, brine circuit, brine pump, C3F8 pipe, accessories, connection to the present system.
Speakers:
Jose Antonio Botelho Direito(CERN), Michele Battistin(CERN)
Slides
09:20
→
09:40
F-595 contract report20m
Advancement status of F-595 "low T Chiller" J&E Hall contract
Speaker:
Jose Antonio Botelho Direito(CERN)
Slides
09:40
→
09:50
Condenser supply contract report10m
Speaker:
Jose Antonio Botelho Direito(CERN)
Slides
09:50
→
10:30
Hydraulic components selection40m
Review of the selection criteria and purchase advancement status of the hydraulic components of the TS (brine, by-pass, heaters, instrumentation, valves, filters, etc.). Expected time for mechanical assembly.