Gas systems weekly project meeting
20/3
piquet:
CMS-RPC purifier 1 not reaching the pressure for phase 2 --> to check why
CMS change cap closed-open and ventilation --> for Salvatore e Aleksandar
dove sono i ticket di cavern closure dei quattro?
ALICE
70 report from Anité
ATLAS
MDT high flow: how to spot in advance?
MDT pump: supplier reply? frequency converter? --> Philipp to be informed that some test at some point will be needed
TGC fill on April 1st. check nC5H12 stock
termination DP-PA for RPC --> ready? for next week w13
CMS
CF4 pressure sensors for vacuum received --> test needed
R134a insulation - isol'tut to check and see what to do
How much gas flow we need for the RPC purifier?
LHCb
SciFi and UT vaisala calibration check
SciFi software modification to be installed --> Patrick to check
CODEX-b --> purif to be prepared, calibration of O2 and some test
RICH1 mixer modification --> 1 card to add --> Patrick
NA62
email to David for anticipate the date of filling --> Roberto
non-LHC safety valve --> check lista di Fabio
Fabio for R134a line to MolSieve R&D
Examples of topics for the common discussions:
-cms id flushing -> Andrea
-cms r134a operation and spare -> Andrea
-cms cf4 operation and spare -> Andrea
-atl tgc nc5h12 -> Kacper
-Analysis boxes -> LPh
-C4F10 new recuperation installation -> Patrick