Choose timezone
Your profile timezone:
Monthly meeting on the advancement of the BI-EP collaboration for the development of the BI rad-tol optical links
All advancing at the expected peace. Just 2 notes:
The quote for the ROSA has been received with a small overcoat wrt what expected: 68CHF Vs 50CHF per piece.
The PCB for the CTTx will be shipped to RAMPAL for assembly with 3 weeks delay due to an issue with the production, but with no real impact for the BPM production. To be monitored the delay accumulation to avoid impacting the CTRx production.