Steering group meeting
Topic: DRD6 WP1 steering group meeting
Time: This is a recurring meeting Meet anytime
Join Zoom Meeting
https://cern.zoom.us/j/62378380919?pwd=IMBLOVBdyUgaom7qgXv8mKuuQAPNTD.1
Meeting ID: 623 7838 0919
Passcode: 698185
---
One tap mobile
+33170379729,,62378380919# France
+33186995831,,62378380919# France
---
Dial by your location
• +33 1 7037 9729 France
• +33 1 8699 5831 France
• +33 1 7037 2246 France
• +41 43 210 70 42 Switzerland
• +41 43 210 71 08 Switzerland
• +41 31 528 09 88 Switzerland
Meeting ID: 623 7838 0919
Find your local number: https://cern.zoom.us/u/cbJa3BbHU9
---
Join by SIP
62378380919@188.185.47.236
• 62378380919@188.185.44.109
---
Join by H.323
• 188.185.47.236
• 188.185.44.109
Meeting ID: 623 7838 0919
Passcode: 698185
-
-
15:00
→
15:05
Introduction 5mSpeakers: Adrian Irles (IFIC CSIC/UV), Lucia Masetti (Johannes Gutenberg Universitaet Mainz (DE))
-
15:05
→
15:15
SiW-ECAL 10mSpeaker: Vincent Boudry (LLR, CNRS, École polytechnique, Institut Polytechnique de Paris)
For the D1.1 (15-layer prototype):
- The building of the first 2 layers done in IFIC, taught us:
- that we should cure the conductive glue at lower temperature to avoid bending the PCB
- we should slightly modify the design and order as soon as possible the HV Kapton
- Their commissioning have shown very good performances:
- very few masked channels (≤0.5%, outside the faulty ASIC), even without a full fledged optimization of thresholds (individual cell adjustments).
- S/N ration in the readout branch ~ 30, with moderate gain, which is comparable as the best measures of seen before.
- The mechanical handling will probably need a slight adjustment.
So no show stopper to launch the rest of the production, but at first view, we are in time to have 15 layers by the end of 2025.
This will depend heavily on the availability of the people from IFIC.
For the D2.1 (the pilote module):- The CALOROC1C design is complete and will soon be launch in production, we could probably test some chips in the fall.
The claimed power consumption (10 mW/ch) are in line with the expectations.
We should also evaluate the consumption of the ancillary components (LDO, concentrators). - In between, we will start thinking on how to adapt the design of the FEV and DAQ for the new ASICs, which are said to be compatible with the existing HKROC. A card based on the HKROC could be a first step.
- The first scheme and simulations of a cold plate, show that 4 mm of Cu (replacing a part of the W), would be enough to cool a layer, with a reasonably low water flow (≤1ℓ/min). More work is needed on how to place the interfaces (together with DAQ).
- The work on timing has started, but we still far from having any conclusions (as you know, it is our ANR).
-
15:15
→
15:25
Highly Compact Calo 10mSpeaker: Yan Benhammou (Tel Aviv University (IL))
-
15:25
→
15:35
DECAL 10mSpeaker: Thomas Peitzmann (Nikhef National institute for subatomic physics (NL))
-
15:35
→
15:45
ScECAL 10mSpeaker: Dr Wataru Otani (University of Tokyo (JP))
The overall R&D schedule has been delayed by approximately one year compared to the proposal, mainly due to a lack of resources.
For milestone M1.6 in the proposal, engineering studies such as the assembly method for the scintillator strips, are currently in progress. We will have a beam test at KEK in May-June for a better understanding of the current prototype. We hope to begin work on other R&D items related to the improved components later this year.
The proposed deliverable D1.6 — full-layer prototype with improved components and beam tests — will also be delayed by about one year accordingly.
We are still lacking dedicated funding, but we plan to apply for joint China-Japan funding later this year.
We are discussing how to update the resource tables, although there are many uncertainties.
-
15:45
→
15:55
AHCAL 10mSpeaker: Katja Kruger (Deutsches Elektronen-Synchrotron (DE))
The overall R&D schedule has been delayed by approximately one year compared to the proposal, mainly due to a lack of resources.
Work at DESY delayed mainly due to delays in CMS HGCAL. Work in other institutes delayed mainly due to delays in hiring process. Work has now started.
Have also started to look into updating the resources table. Have to find an agreement between institutes which information to provide.
-
15:55
→
16:05
GlassScintHCAL 10mSpeakers: Sen Qian (Chinese Academy of Sciences (CN)), Sen Qian qians
- 16:05 → 16:15
-
16:15
→
16:25
MPGD-HCAL 10mSpeaker: Luigi Longo (Universita e INFN, Bari (IT))
-
16:25
→
16:35
ADRIANO3 10mSpeakers: Burak Bilki (Beykent University (TR), The University of Iowa (US)), Corrado Gatto (INFN & NIU)
-
15:00
→
15:05