Participants: Juan Carlos Perez, A. Haziot, N. Peray, M. Canale, V. Roxenborg, E. Fernandez Mora, J. Ferradas

 

 

Structure:

  • M. Canale showed the new concept for encapsulated bladders.
    • Add mechanical stopper for the bladders in the structure, to guarantee the proper alignment.
    • Question to P. Moyret on yoke sub-assembly (bushings): Two holes or one hole and one slot? Check RMM and follow same logic.
    • Keys to be designed as RMM (shimmed in sandwhich configuration).

 

Winding tests:

  • First tests with FRESCA2 cable.
    • Perform a second test with BOND cable

 

Impregnation:

  • Vertical pad design & impregnation concept:
    • Juan Carlos to organize a separate and dedicated meeting on this topic.
  • For TFD, they use a modular impregnation mold. But then, they do not adjust the v-pad because they use a smart shim

  • Without the smart shim, the ugly part is the need of adjusting the v-pad all the time

 

Modelling:

  • Vendela is modifying the existing model with the new geometry:
    • Compute the new baseline results.
      • Check if results are OK (including bladder force and opening in the new configuration)
    • Compute if we're able to pre-load yoke-shell subassembly.
    • Compute if we can start the preload with only one large bladder.
    • Compute a case with two bladders on top of Vpad. Is it possible?