RAL Tier1 Experiments Liaison Meeting

Europe/London
Access Grid (RAL R89)

Access Grid

RAL R89

Zoom Meeting ID
66811541532
Host
Alastair Dewhurst
Useful links
Join via phone
Zoom URL
    • 13:30 13:31
      Experiment Operational Issues 1m
    • 13:35 13:40
      ATLAS Operations Report 5m
      Speakers: Brij Kishor Jashal (Rutherford appelton laboratory), Jyoti Prakash Biswal (Rutherford Appleton Laboratory)
    • 13:40 13:45
      CMS Operations Report 5m
      Speaker: Katy Ellis (Science and Technology Facilities Council STFC (GB))

      Errors yesterday are on CMS side.

      A couple of warnings on squid - 

      1. many database queries from the site have connected directly to the Frontier servers or backup proxies, with a high rate of queries not going through the local squid(s): T1_UK_RAL\tcmscernct\t255759\t3922096
      2. No IPv6 access

      A small spike of job failures yesterday. Otherwise good performance.

    • 13:45 13:50
      LHCb Operations Report 5m
      Speaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)
      • Raw data distribution starts very soon (planned for today or tomorrow)
        • 1PB free on antares LHCb allocation (which is 2024-25 FY), so need update it soonish.
      • ECHO problems (faulty disk on the 30th of April causing some slow IOPs + slow IOPs for uknown reason on the 7th of May) caused file loss and corruption (GGUS 683184)
        • Search for corrupted files is finished
          • A handful of files found, the ones that have other replicase have already been re-replicated to RAL
          • That (hopefully) concludes the incident
      • There were a lot of upload failures from HLTFarm and NIPNE to RAL
        • Not our fault
          • Network issues at NIPNE and HLTFarm connectivity problems

       

      CVMFS (sorry, misplaced):

    • 13:50 13:55
      ALICE Operations Report 5m
      Speaker: Alexander Rogovskiy (Rutherford Appleton Laboratory)
    • 13:55 14:00
      LSST Operations Report 5m
      Speakers: Mathew Sims, Timothy Noble (Science and Technology Facilities Council STFC (GB))
      • File Movement causing disruption to jobs at RAL for the DC2 dataset
        • Meeting today to hopefully sort the RC2 dataset (to supersede DC2) should be taking around 1 month 
      • Message stack in place and monitroing for it is evolvong well
        • Once complete and documented plans to share with other sites
      •  
    • 14:00 14:01
      Tier-1 Projects 1m
    • 14:10 14:15
      Anatares Upgrade 5m

      New EOS nodes
      Repack Progress

      Speakers: George Patargias, Thomas Byrne
    • 14:15 14:20
      Echo Upgrade 5m

      Dell 24 Storage Deployment
      New gateways
      SSD Storage

      Speakers: Robert Appleyard, Thomas Byrne
    • 14:20 14:25
      Varnish For ATLAS 5m
      Speaker: Brij Kishor Jashal (Rutherford appelton laboratory)
    • 14:25 14:35
      XRootD Development 10m
      Speakers: Alexander Rogovskiy (Rutherford Appleton Laboratory), Jyothish Thomas (STFC)
    • 14:35 14:45
      Utilizing GPUs 10m
      Speakers: Jyoti Prakash Biswal (Rutherford Appleton Laboratory), Thomas Birkett
    • 14:45 14:46
      AOB 1m
    • 14:46 14:55
      Summary of Operational Status and Issues 9m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore
    • 14:55 15:00
      Any other Business 5m
      Speakers: Brian Davies (Lancaster University (GB)), Darren Moore