IBDRS ventilation system
Minutes of the meeting discussing the IBDRS ventilation system held on the 28/05/2025
1. General information
· Only Buildings 738 and 734 will be connected to the mechanical ventilation system under this project.
· Building 736 (access galley) and the technical room B.734/U1-401 will not be connected to the new system.
· The air inside B. 738 and B. 734 will not be activated (no need for nuclear filters)
· The Air Handling Unit (AHU) for this system will be located in Building 170/3-402
2. EN-CV installation for the IBDRS ventilation
· The system will have two modes:
i. Beam mode (or recirculation mode) that will recirculate 1000 m3/h of air from inside B. 738 and B. 736
ii. Access mode that will supply a minimum fresh air for occupants
· The necessity of a flush mode or delay time between the modes is to be confirmed with RP -> (action EN-CV)
· All the openings for CV services between B. 738 , B. 734 and the outside and B. 170 have to be confirmed with RP-> (action EN-CV)
· Fire dampers will be installed at all ductwork openings connecting Buildings 738 and 734 to the outside and Building 170.
· A differential pressure sensor will monitor pressure differences between Building 738 and the outside
· AHU maintenance will only take place when the system is in Access Mode.
· A pre-commissioning test of the new ventilation system will be carried out before removing the old beam dumps to evaluate pressure levels in the target area.
3. Connection of the IBDRS ventilation control system with the Target area ventilation control system
• Interlock logic between the IBDRS and target area ventilation systems:
o If a fire is detected in the target area, ventilation in Buildings 738 and 734 will stop.
o If a fire is detected in Buildings 738 or 734, ventilation in the target area will stop.
o If the under-pressure in the target area is lost, ventilation in Building 738 will stop.
o In the event of a power failure or ventilation stop in Buildings 738 or 734:
• The target area ventilation must restart first,
• Under-pressure must be restored in the target area before restarting ventilation in Building 738 (which will restart in Beam Mode).
• Ventilation Modes comparison:
• Beam Mode / Flush Mode in Target Area:
- No access to Buildings 738, 734, or 736.
- Air will be recirculated inside Building 738, with no fresh air supply.
• Access Mode in Target Area:
• The IBDRS ventilation system will also operate in Access Mode, allowing for fresh air supply and access.