Preparation cosmic stand setup:
- started characterization of the scintillators, already available at cosmic stand: 3 top ones and 3 bottom ones
- decided to add 2 extra scintillators 30x30cm2 to use as further coincidence (provided by GDD)
- the scintillators+logic setup should be ready by next week
- shipped to cern one miniSRS+FEC+ADC with 20 APVs, together with 2 GEM X&Y readout
Chambers 50x50cm2:
- unfortunately there was a problem in the readout production and readout PCBs must be redone -> not yet understood how much is the delay
HCAL prototype stucture:
- possibility to include a further scintillators with a hole in the middle -> it can be used to trigger on shower, avoiding mip

WP7 timing workshop: https://indico.cern.ch/event/1542867/