Infrastructure B.180 Meeting #10

Europe/Zurich

News:

 

  • CAPACITEC answered and they will come back to us with a proposal
  • Copper cable (800 m) will be available early next week (23-25 June). Already contacted Francois Olivier for the insulation (everything is on his planning since some months).
    • We will send the full length and we will try to have it insulated before the summer break (after MQXF ULs)
  • Seb will start looking at the modifications needed on the cable guiding system (Independent from SIEMENS)
There are minutes attached to this event. Show them.
    • 09:00 09:20
      Discussion 20m
      Speaker: Jose Ferradas Troitino (CERN)