BIPXL - BiWeekly Meeting
BIPXL jira kanban board: https://its.cern.ch/jira/secure/RapidBoard.jspa?projectKey=BIPXL&rapidView=9072
Follow-Up from last meeting
- MD data results & comparison plots.
- Status of PS horizontal diagnostics or replacement decision.
- See https://its.cern.ch/jira/browse/BIPXL-61
- Seems to bo some thermal/radiation effects only visible in the PS
- GBTX configuration reliability improvement.
- Solved with updates to the config in the internal driver
- 4.1.3-release
- 4.1.2-release
- Telescope deployment progress & initial timing validation.
- Event rate investigation findings.
- DMA / driver integration status.
Minutes
Date: 29/08/2025
Participants: James, Mark, Steen, Hampus, Juri, Lukas (Zoom), Gabriela (Zoom)
Key Technical Updates
-
Timing & Synchronization: Current telescope timestamps limited to ±100 ns. TimeWalk correction demonstrated (~10 ns residual). SPS bunch-by-bunch requires <25 ns precision. Next step: SPS BGI calibration using single LHC bunch (1 x 5ns bucket filled) or in the future electron gun.
-
HL-LHC Beam Profile Review (23 Sept): BI contribution: 20-min BGI talk (James) on design, performance, and PS/SPS experience. Results needed before Lukas’ holiday.
-
Telescope: Detector correlations now clear; track χ² improving with ongoing software alignment. Next: reference crystal installation + multi-volume crystal tests.
-
DAQ/FESA Stability: Occasional crashes during MD runs (likely data-volume related). Stable in command-line mode; monitoring continues.
-
Hardware / Optics: Broken fibre in telescope channel traced to installation; procedure should be documented. GBTx configuration improved significantly and seems stable now in 4.1.3-release branch.
-
SPS BGI Vertical: Raw data path non-functional; likely SFP/module issue. Plan: retest in lab post-run with validated SD cards and spares.
Strategic / Forward Planning
-
PCIe/DMA Support: Ongoing difficulties with Edge + XDMA drivers. Options:
-
Investigate Edge 2.1 compatibility.
-
Fallback to commercial PCIe cards with supported DMA drivers.
Decision required within 2 weeks to ensure 2026 PS/SPS BGI readiness.
-
-
PS Horizontal BGI: Persistent no ionization electron problem. Decision: build new instrument from existing spares; test and qualify before LS3.
- PS BGI Front-Ends: Failing after minutes due to (probably) thermal problem. Hampus & Wilfried to implement solution with fan. Radiation damage to DC fans could be an issue.
-
SPS Shields: Horizontal now robust with RF shield. Vertical shield upgrade under study (diamond or smaller-hole variant). Decision point: end November. Possible MD to test shield options.
Acknowledgement
-
Farewell to Gabriela (final day). Team expressed gratitude for her 3 years of valuable contributions.
Follow-up next meeting
-
Prepare BGI results for HL-LHC review (Sept 23).
-
Build new PS horizontal BGI instrument.
-
Prepare alternative SPS vertical shield (diamond-type).
-
Standardize fibre installation procedures.
-
Continue monitoring FESA crashes.
-
Finalize PCIe/DMA approach by mid-September.