    • 1
      News
      Speaker: Luigi Longo (Universita e INFN, Bari (IT))

      General news:

       

      TestBeam:

      • PS between Oct 15 and Oct 29
      • 4 GEMs with X&Y view are under test at the GDD: their characterization is on-going with APVs; some time lost in finding the best grounding configuration and a proper HV range to avoid APVs saturation; plans to finish by this month. @Alessandro, any other update on this?
      • rotameters: Michele B. has already asked Roberto Guida for 2 pair of rotameter
      • scintillators: next week Lisa will be at cern for the characterization of the 3 scintillators we will use in our structure
      • structure preparation:
        • crane operators have preferred to anchor the structure from the top bosh profiles, while the design was made in view of anchoring the structure from the bottom -> decided to add few extra metallic plate to strengthen the structure; a Bari technician will come next week to cern
        • services preparation will be done next week
      • DAQ:
        • will we use vmm? if so, how many we have?
        • if we will go on with APVs, we will not have to many: 11 master and 12 slave
      • Monitoring:
        • asked for a central grafana and influx -> good for having our setup ready and running also after the testbeam at the north area
      • preparation area:
        • try to move the structure earlier to PS area to start HV training and gas flushing; in contact with Michael Lazzaroni and  Aboubakr Rahmoun 
      • can you please upload the first tab of the spreadsheet https://docs.google.com/spreadsheets/d/1w229H1DXgvVOeuJRb2cBzjLS8fqi9ZdPFXQQXKAi2uk/edit?usp=sharing with your available days at cern?
    • 2
      Tracker updates
      Speaker: Alessandro De Robertis (Universita e INFN, Bari (IT))
    • Roundtable
      Conveners: Darina Zavazieva, Luca Moleri (Weizmann Institute of Science (IL)), Luigi Longo (Universita e INFN, Bari (IT)), Mauro Iodice (INFN - Sezione di Roma Tre)

      Chambers:

      • GEM tracker with X&Y strips: 3+3 panasonic connectors
        • can be equipped with only the central connectors being the beam spot diameter of 2 cm
        • 3 GEM chambers x 1 hybrid = 3 hybrids
      • MPGD 20x20cm2: 8 chambers, each with 3 connectors
        • total 24 hybrids 
      • MPGD 50x50cm2: 4 chambers, each with 16 connectors
        • total 64 hybrids

       

      DAQ system:

      • SRS system:
        • FEC:
          • Bari: 2 FEC v6
          • Weizmann: 4 FEC v6
        • DVMM
          •  
        • HDMI-microUSB of equal length:
          • Bari: 35 of 2mm length
        • Hybrids:
          • Weizmann: 32 hybrids
          • RM3: 4 hybrids 
        • Panasonic-HRS adapters for GEMs 
        • power box
        • CTF:
          • Bari: 1
        • switch:
          • Bari: 1 netgear
        • PC:
          • Bari: to be checked with Lisa but the system should be installed on hcal laptop
        • Action items:
          • check what is missing and ask Lucian and Karl (@Luigi)

      • Reconstruction:
        • geometry: measure the distance between the various layers (@Luigi, @Lisa) 
        • 50x50cm2 chambers mapping (@Luigi or any volunteer)