Choose timezone
Your profile timezone:
MD16803 - TWOCRYST Final operational setup
MD16804 - Slow-start PPLP ramp for HL-LHC era
MD 16904 - BSRH Calibration
MD16907 - IR3 operational losses limit (part 2)
MD16906 - 2026 (and HL-LHC) cycle development
MD15883 - Studies in preparation for 2026 HL test (ramp in steps)
MD 16903 - Single bunch tune shifts at injection
MD 16843 - Losses when bringing the beams in collisions with 8b4e
MD 16883- Halo cleaning with stable islands
MD16763 - Stability characterisation with electron cloud at FlatTop