Status
- New beamline
- Vacuum ongoing
- Screens ongoing - Stephane coming today
- Installation of water cooling ongoing
- Beam to end of straight line
- single bunch, 1.3 nC , 60% transport
- with a few bunches, about 70%, but even higher going down to 50%...
- QE studies
- Laser position scans
- found optimal point, also optimal for solenoid
- Spectrometer on straight line also ok
- Good alignment with laser.
- Klystrons all OK.
- Laser all OK.
- screen calibration not done
- fixed modulation
- power in front of cathode: 1uJ/bunch in front of the gun
- power meters:
- one (downstairs) saturates around 33 uJ
- the other one (upstairs) has a systematic offset of 1 uJ
- shall we re-install filter?
- BCM operational
- 395 noisy... Giacomo to check with Wilfrid
- BPM no signal (not much investigation)
- Intensity GUI
- some issues: Kyrre will check with Antonio
This week+
- need to arrive ~80% transport
- Install robot on the table
- install cameras
- Check flat beam profile
- HUG -> October 6th-10th, October 20th-26th, November 3rd-7th
- no confirmation yet
- by Wednesday, everything could be ready - checkup needed.
- Need to evaluate dark current
- Prepare for CHUV -> October 13th-19th (can also be postponed)
- need to prepare several holders, several hardware configurations, ...
- exact requirements will be sent likely by tomorrow
- need a nice flat beam, or very Gaussian one
- no need for very high charge bunch
- will probably require 2 weeks of beam
- Dosimetry done by CHUV
- Alfred's software -> recovered by Antonio
- Antonio: needed for 3D printing of new holders...
- Note: some drawings maybe still missing
- Need to prepare layout of machine
- and print it for control room