Speakers:
Aleksandr Dmitriev
(Joint Institute for Nuclear Research (RU)),
Alice Marie Goillot,
Antti Onnela
(CERN),
Bartosz Maksiak
(National Centre for Nuclear Research (PL)),
Benjamin Moritz Veit
(Johannes Gutenberg Universitaet Mainz (DE)),
Carlo Ferrari
(Fermi National Accelerator Laboratory),
Clara Matteuzzi
(Syracuse University (US)),
Eva Sommer
(University of Vienna (AT)),
Federico Ravotti
(CERN),
Francois Duval
(CERN),
Giuseppe Pezzullo
(CERN),
Giuseppe Ruggiero
(Universita e INFN, Firenze (IT)),
Graziano Venanzoni
(Universita & INFN Pisa (IT)),
Hans Danielsson
(CERN),
Jan Friedrich
(Technische Universitaet Muenchen (DE)),
Jasper Kirkby
(Goethe University Frankfurt (DE)),
Josef Novy
(Czech Technical University in Prague (CZ)),
Laura Molina Bueno
(Univ. of Valencia and CSIC (ES)),
Martin R. Jaekel
(CERN),
Maxim Alexeev
(Universita e INFN Torino (IT)),
Nikolaos Charitonidis
(CERN), Dr
Oleg Denisov
(INFN, sezione di Torino),
Paolo Crivelli
(ETH Zurich (CH)),
Paolo Martinengo
(CERN),
Roberto Piandani
(Univ. Autonoma de San Luis Potosi),
Salvatore Danzeca
(CERN),
Sergei Gninenko
(Millennium Institute for Subatomic Physics at High Energy Frontier (CL)), Dr
Thomas Poschl
(CERN),
Vladimir Poliakov
(Millennium Institute for Subatomic Physics at High Energy Frontier (CL))
-
- The run 2025 is proceeding quite smoothly and still users coming in both areas for the last weeks with protons ending the 19/11. Now priority users are the one testing the BPOL regulator devices (hundreds of new samples) and we continue the preparation of the HEARTS ion run overnight when the proton beam is stopped.
- For us is OK to advance the restart of T8 in 2026 of one week (the activities planned for this last YETS are anyhow minimal on our side, nothing urgent, and to restart earlier the last run before LS3 is certainly beneficial for all our users). Some user experiments are already planned immediately at the beginning of the next run.
-
-
-
-
- We are preparing for starting data taking with liquid hydrogen target
- Detector being prepared, some problems with CEDAR, but experts fixed the problems.
- Safety clearance for using LHT still to be granted (last EDMS documents need to be released).
- We are waiting for the control interface to be transferred to us by DT-DI. This is the blocking issue now, but it should be done by tomorrow evening. If this is done tomorrow, we will start injecting hydrogen this Thursday.
-
CLOUD's run proceeds well and in its planned schedule.
East Hall evacuation triggered on 15 Oct at 11:00 by a CLOUD team member (CERN staff) unintentionally pushing an evacuation button during material handling in the corridor next to CLOUD. Fire brigade came on site. According to the TSO the evacuation happened correctly. Apologies from CLOUD to the other East Hall users for the perturbance caused.
-
-