Installation Drawings
- Luca has confirmed that the installation drawings of the beam elements are in progress and should be completed by the end of the year.
- There may be a potential extension of a couple of months to ensure that all comments from the survey team are properly implemented.
There are minutes attached to this event.
Show them.