AWAKE Run 2bc Spectrometer
CERN
Meeting Notes
Present: M. Turner, M. Wing, F. Pannell, J. Wolfenden, M. Bergamaschi, C. Pakuza, E. Gschwendtner
1. Camera Array Installation (Spectrometer Scintillator Screen)
-
Camera distances: Keep approximately the current setup: cameras ~1.2 m from the screen, viewing from 30° below.
-
High-resolution camera: Will remain ~0.2 m from the screen on a translation stage.
-
Spectrometer camera array: Mounting on a breadboard attached to the support structure (as suggested) is preferred. Other options (e.g., sending light down with a mirror) will be considered, but dust concerns make this proposal most suitable.
-
OSR port: A breadboard with an opening to route light downward, as suggested, should work. The OSR team will refine the optics and light path (~1–2 m total), which will not fit on the small in-plane breadboard before the laser mirror tank.
Actions:
-
MT to update and discuss with Edu
-
MT to share a top view of the area with the OSR team
-
after that: OSR team to reserve breadboard space in the tunnel
-
2. OSR Viewport
-
DN63 flange sticking out preferred, since imaging location will be ~2.5 m upstream. This is currently the baseline.
Actions:
-
MT to check with Nicolas if the port is perpendicular to the light path (line starting at the beginning of the magnet)
-
MT to launch approval of the dipole vacuum chamber drawing
-
All to check the drawing carefully and provide comments
-
MT to check with Nicolas if the chamber is additionally secured (e.g., to the sides of the magnet)
-
Reference drawing: Previous chamber (until AWAKE Run 2b)
- DC to share draft of the specification document
- DC to finalize specification document and launch approval procedure
3. Other
- Position of the spectrometer dipole magnet has been finalised
- There is a solution that allows a 2m gap from the plasma exit to the beginning of the magnetic field of the first spectrometer quad.
- However, if we can increase this distance it would be preferred to add an alignment screen and reuse the laser beam dump.
- DC has done calculations on this --> Action: DC to present results at a further meeting
3. Follow-up from Previous Meeting Actions
-
Joe and others have not yet received simulation input from John to check the emittance diagnostics
Action:
-
MT and EG to check with John
Next meeting on the 14th of January.