Update from CAD design (N. Peray & Dimitrios):

  • Nico prepared a summary on the different handling operations for coil and magnet assembly
    • Up to impregnation step, all handling tooling is already designed and ready
    • There are no lifting threaded holes in the pole, they were initially foreseen but then removed after the decision of splitting the pole in inner and upper layer.
      • For the thinnest part in the pole (4 mm) it is very hard to guarantee that we have at least threaded two times the screw diameter
    • Slide 2: The first row can be removed by turning the impregnation mold and opening already the mold with the coil aperture upside
    • Important to lift the coil in both positions with the aperture upside and downside
    • Action: Nico will try to simplify the lifting beam and make it compatible with the different configurations.
  • Dimitrios prepared a summary on the end plate loading sequence:
    • Proposal is to remove the complex system for centering the plate and just consider a lifting table plus some mechanical jacks

 

Update from endplate design (J. Ferradas):

  • Proposal is to keep the 150 mm thick 

 

Update from dummy components (V. Roxenborg):

  • Quotation to be updated with the material for rods (50mm)

 

 

 

 

 