ACTION ITEMS
1) LACS/LASS
• Confirmation that budget for non-interlocked areas access control system now accepted (LS).
• In PM85 at present ~3000 transactions for access system (PN).
• SC (safety commission) to write report on non-interlocked area access.
• Situation of pressurized areas including access point (ATLA, CMS) not yet fully analyzed --> action by whom??
• PZ85 renovation planned for Sep 2007 for 3 wks.
• PX15 upgrade planned for Sep 2007. --> access organization during this period needs to be defined and put into place before.
• R. Nunes is responsible for access cards. --> reassess nbr of cards required for each experiment.
• Experiments requested to verify and update table with upper limit of persons per area.
2) Status from Safety system review
• Safety matrix in the experiments needs to be assessed.
NB: C. Schaefer has implemented L3 alarm logic in the L3 experiment --> could maybe serve as use case?
There are minutes attached to this event.
Show them.