FCC PED Work Packages Mandates

Europe/Zurich
Description

This page collects the mandates of the different FCC PED work packages. 

Any comment/request should be communicated to the PED coordinators

    • 1
      Physics work package
    • 2
      Detector concept work package
      • a) Detector Subsystem groups

        Mandate for the conveners of the Detector Subsystem groups of the FCC Detector Concepts Work Package during the FCC pre-TDR phase (2025-2027)

      • b) Detector Concept studies

        Mandate for the conveners of the Concept Study groups of the FCC Detector Concepts Work Package during the FCC pre-TDR phase (2025-2027)

      • c) Call for nominations for conveners of the subgroup on tracking detectors
      • d) Call for nomination for conveners of the subgroup on Trigger and Data Acquisition
    • 3
      Software and computing work package
      • a) Mandate

        FCC PED Physics Software and computing work package organization for the pre-TDR phase

      • b) Call for nominations for conveners of the working groups