Final cooling solenoid - progress meeting

Europe/Zurich
376/1-020 (CERN)

376/1-020

CERN

16
Show room on map
Zoom Meeting ID
63807523337
Host
Carlotta Accettura
Alternative host
Raphael Unterrainer
Useful links
Join via phone
Zoom URL

Meeting Details

Agenda Items and Notes

1. Progress on the 4.2 K measurement setup - Joints, Current Injection and Containment

  • Technical drawing to be finished. (@Frantisek Sanda)
  • For 10T setup and setup for Tim, components for 6 double pancakes (to be confirmed) should be produced. Full production expected to be completed by end of April, first pieces expected early April for single-pancake tests. (@Frantisek Sanda@Jorge Guardia Valenzuela@Raphael Unterrainer)
  • Single-pancake tests are conducted as soon as the first components have been manufactured, to adjust production if necessary. (@Raphael Unterrainer)

2. Progress on the 77 K measurements - Status of new setup, Status of new DAQ Software

3. Current status on precompression tests

4. Shrink fitting setup design status

Other