Gas systems weekly project meeting

Europe/Zurich
32/1-A24 (CERN)

32/1-A24

CERN

40
Show room on map
gas systems project meeting
Zoom Meeting ID
62095888225
Host
Beatrice Mandelli
Useful links
Join via phone
Zoom URL

piquet:

 

Calibration bottles O2-H2O status

 

ALICE

70 report from Anité [GASSYSTEMS-70] TPC gas quality - filters to Benoit - CERN Central Jira (I don't see the report, can you please add it?)

several alarms blocked: [GASSYSTEMS-628] ALICE alarms blocked - CERN Central Jira

TOF gas mixture analysis -> [GASSYSTEMS-639] TOF gas mixture analysis - CERN Central Jira & ELOG

TRD membrane is connected ? -> [GASSYSTEMS-717] TRD membrane status - CERN Central Jira

P&ID drawing check who is doing -> [GASSYSTEMS-736] ALICE P&ID drawing check - CERN Central Jira

MID swap of pumps during MD because sometime the system stop -> TICKET

 

 

 

ATLAS

MDT frequency converter (need to be replaced TICKET) ELOG - ATLAS MDT Test convertisseur 4101 avec la pompe 4201 

RPC distribution rack regulation valve (TICKET)

RPC secondary mixer (TICKET), info to be given to ATLAS

RPC purif 3 circuit breakers & meeting -> [GASSYSTEMS-718] RPC purif 3 electrical issue - CERN Central Jira --> meeting when?

ATLAS-TGC flow difference --> [GASSYSTEMS-612] ATLAS-TGC flow difference - CERN Central Jira

 

 

CMS

RPC purif test at workshop, PLC needed -> TICKET

R134a insulation - isol'tut to check and see what to do -> ticket IO [GASSYSTEMS-578] R134a insulation - isol'tut to check and see what to do - CERN Central Jira

How much gas flow we need for the RPC purifier? -->  [GASSYSTEMS-579] CMS-RPC How much gas flow we need for the RPC purifiers? - CERN Central Jira @MariaCristina notes to be added

RPC bypass pump too much closed --> [GASSYSTEMS-604] RPC bypass pump too much closed - CERN Central Jira

RPC with CO2 like ATLAS and effect on R134a recuperation -> [GASSYSTEMS-606] RPC with CO2 like ATLAS and effect on R134a recuperation - CERN Central Jira

R134a Upgrade (hardware and software) to be tested -> [GASSYSTEMS-594] R134a Upgrade (hardware and software) to be tested - CERN Central Jira

DT vaisala reading difference between SG and US -> [GASSYSTEMS-677] CMS DT vaisala reading difference between SG and US - CERN Central Jira

CMS-FGR -> TICKET should we add a module. Do we need to buy something? follow-up

CMS-FGR -> TICKET Maria Cristina già fatto per bypass

CMS-FGR -> TICKET flowmeter for Huber

CMS-RPC IR not stable -> elog Maria Cristina -> TICKET

CMS-ID flushing. refurbishing of old racks material and manpower need to be estimated -> TICKET @Gianluca ticket number for project

R134a huber temperature can be controlled by PLC -> TICKET

 

 

LHCb

TS1-> RICH1 leak search (postponed), SciFi some work from others expected

RICH1 what we learn from 1st fill -> [GASSYSTEMS-608] RICH1 what we learn from 1st fill - CERN Central Jira

summary of the C4F10 bottles --> TICKET or ELOG -> [GASSYSTEMS-660] summary of the C4F10 bottles - CERN Central Jira

alarms blocked: [GASSYSTEMS-631] LHCb alarms blocked - CERN Central Jira

RICH2 filter blocking -> [GASSYSTEMS-731] RICH2 pump filter differential pressure sensor not working - CERN Central Jira

P&ID drawing check who is doing -> [GASSYSTEMS-739] LHCb P&ID drawing check - CERN Central Jira

RICH1 cleaning , when? not before mid-september? -> TICKET 

RICH1 remove membrane rack before end of HL-LHC operation and/or change piping-> TICKET

RICH2 injection through recuperated CF4 -> TICKET

fire detection alarms reported by Pieter, more info? but not on us. Cleaning of SG room -> TICKET 

CODEX-b interlock for flammable gas detection -> Patrick

RICH1 leak repair -> December 9th tbc -> TICKET

 

NA62

CEDAR maintenance needed -> [GASSYSTEMS-609] CEDAR maintenance needed - CERN Central Jira

change of pressure sensor used for leak warning? -> [GASSYSTEMS-741] NA62-CEDAR move to keller pressure sensor? - CERN Central Jira

 

GIF++ TGC gas system and return flow: [GASSYSTEMS-624] GIF++ TGC gas system return flow - CERN Central Jira

[GASSYSTEMS-674] MFCs to be checked - CERN Central Jira :

 

non-LHC safety valve --> check lista di Fabio

[GASSYSTEMS-172] non-LHC safety valves to be verified - CERN Central Jira

ELOG - safety valves to be verified for non-LHC systems

 

 

 

Additional requests/projects/discussions

887 CEDAR new "mixers" --> [GASSYSTEMS-509] CEDAR for beam lines - CERN Central Jira

 

AMBER

EDMS leak test? 

test certificate x-ray?

ATEX certificate?

who is technical coordinator

resource manager Oleg D?

no money? should we stop? and resume in 2026? 

Commissioning when? -> TICKET 

when they would like to start? Moritz? -> ask

 

LEAK DETECTORS LIST -> TICKET

MAINTENANCE INTERVENTIONS WORK ORDER FOR STATISTICS -> TICKET

 

PROJECT 2025

summary TICKET

 

 

examples of topics for the common discussions:

 

-cms id flushing -> Andrea

-cms r134a operation and spare -> Andrea

-cms cf4 operation and spare -> Andrea

-atl tgc nc5h12 -> Kacper

-Analysis boxes -> LPh

-C4F10 new recuperation installation -> Patrick

 

There are minutes attached to this event. Show them.
    • 09:00 09:10
      Piquet interventions 10m
      Speakers: Gianluca Rigoletti (CERN), persons on piquet
    • 09:10 09:15
      piquet planning 2026 5m
      Speaker: Roberto Guida (CERN)
    • 09:15 09:40
      YETS activities 25m
      Speaker: Roberto Guida (CERN)
    • 09:40 09:50
      Review new ticket or updated during current week 10m

      Jira dashboard: https://its.cern.ch/jira/secure/RapidBoard.jspa?rapidView=9098&view=detail
      Confluence page: https://confluence.cern.ch/display/KBFGS

      Speaker: Roberto Guida (CERN)
    • 09:50 10:00
      gas systems status (with focus on xmas break) 10m
    • 10:00 10:05
      other M&O news 5m
      Speakers: Beatrice Mandelli (CERN), Gianluca Rigoletti (CERN)
    • 10:05 10:10
      Gas mixture analysis for LHC experiments 5m

      https://epdt-gasmonitoring.web.cern.ch/

      Speaker: Maria Cristina Arena (CERN)
    • 10:10 10:20
      projects ready for workshop (and to be planned) 10m
      Speakers: Albin Mekkattukulam Joshy (University of Applied Sciences Bremerhaven (AF)), Amin Bouzaiene (EPFL - Ecole Polytechnique Federale Lausanne (CH)), Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Burkhard Schmidt (CERN), Davide Casarotto (CERN), Fabio Bordon, Gianluca Rigoletti (CERN), Louis-Philippe De Menezes (CERN), Maria Cristina Arena (CERN), Mattia Busato (CERN), Mattia Verzeroli (Shanghai Jiao Tong University (CN)), Miguel Afonso (Universidade de Lisboa (PT)), Patrick Carrie (CERN), Pieter Vanslambrouck, Roberto Guida (CERN), Stefania Juks (Université Paris-Saclay (FR))

      -pressure sensor for Stefania (uCL)

      -nC5H12 panel for 256 (Mattia Verzeroli)

      -frame for RPC detector

      -MDT leak repair Fabio 1 day

    • 10:20 10:25
      FSU planning for coming weeks & Jobs status 5m
      Speaker: Andrea D'Auria (CERN)
    • 10:25 10:55
      EAM/Infor: update
      Convener: Miguel Afonso (Universidade de Lisboa (PT))
      • 10:25
        interventions from past week 10m
        Speaker: Miguel Afonso (Universidade de Lisboa (PT))
      • 10:35
        maintenance and spare parts follow-up 10m
        Speaker: Miguel Afonso (Universidade de Lisboa (PT))
      • 10:45
        pump working hours 10m
        Speaker: Miguel Afonso (Universidade de Lisboa (PT))
    • 10:55 11:05
      aob and requests for jobs at workshop 10m
      Speakers: Albin Mekkattukulam Joshy (University of Applied Sciences Bremerhaven (AF)), Amin Bouzaiene (EPFL - Ecole Polytechnique Federale Lausanne (CH)), Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Burkhard Schmidt (CERN), Davide Casarotto (CERN), Fabio Bordon, Gianluca Rigoletti (CERN), Louis-Philippe De Menezes (CERN), Maria Cristina Arena (CERN), Mattia Busato (CERN), Mattia Verzeroli (Shanghai Jiao Tong University (CN)), Miguel Afonso (Universidade de Lisboa (PT)), Patrick Carrie (CERN), Pieter Vanslambrouck, Roberto Guida (CERN), Stefania Juks (Université Paris-Saclay (FR))