EP equipment check

Europe/Zurich
RILIS

RILIS

  • They have four cables around this area -> all being removed now by EP (to follow up with Liss/Hanne this happened)
    • two for collaps
    • one for vito
    • one for cris
  • Liss mentioned they have a PhD student who will be rebuilding the gray cage
    • It will be skinnier and longer
    • This will be done between March - Sept
    • Need to coordinate well with Liss for activities of dismantling RILIS and their PhD work
    • Are people allowed to work in that area while dismantling is ongoing?
    • Also mentioned in one of the integrations there was a post put infront of their small cage which does not work as it blocks their window
      • Either the pillar needs to be moved, or a window throughthe pillar needs to be put in place.