# DIRAC Development Meeting (Ddev)
- **At CERN:** Federico, Alexandre, Chris, Christophe
- **On Zoom:** Stella, Loris, Heloise, Janusz, Hideki, Andrei, Natthan, Mazen, Vladimir, Alexey
- **Apologies:** Daniela
## Product Goals & Roadmaps
- Transition to DiracX:
```mermaid
flowchart LR
subgraph CWL["CWL"]
CWL1("CWL submission endpoint")
CWL2("CWL production system")
CWL3("Transformation system machinery"):::blocked
CWL4("Use CWL natively in new matcher"):::blocked
end
subgraph Core["Core"]
CoreTasks("Tasks")
Core2("RSS")
Core3("DMS")
end
subgraph WMS["WMS"]
WMS1("Matcher"):::blocked
WMS2("Pilot authentication")
WMS3("Pilot submission"):::blocked
end
CWL3 --> CWL4
CoreTasks --> Core2 --> Core3
CoreTasks --> WMS1
CoreTasks --> CWL3
WMS1 --> CWL4
CoreTasks --> WMS3
click CoreTasks "https://www.github.com" "This is a tooltip for a link"
classDef done fill:#B2DFDB,stroke:#00897B,color:black,stroke-width:2px;
classDef blocked fill:#BBBBBB,stroke:#222222,color:black,stroke-width:2px;
subgraph Legend
L2("Completed"):::done
L1("Ready for work")
L3("Blocked"):::blocked
end
```
- CWL integration:

## Refinements
### Needs triage
https://github.com/orgs/DIRACGrid/projects/30/views/7
**Goal: build a shared understanding of the project.**
> DIRAC
- [DictCache issue? (blocked)](https://github.com/DIRACGrid/DIRAC/issues/8472)
- [Logging Tornado seems off](https://github.com/DIRACGrid/DIRAC/issues/8469)
- [Gracefully stop pilots](https://github.com/DIRACGrid/DIRAC/issues/8346)
- [Job grouping in HPC with no ext. connectivity](https://github.com/DIRACGrid/DIRAC/issues/8475)
> WebAppDIRAC
> diracx
- [Can't use 2 different clients within the same test](https://github.com/DIRACGrid/diracx/issues/788)
- [Documentation bugs](https://github.com/DIRACGrid/diracx/issues/797)
- [Autorest & mypy](https://github.com/DIRACGrid/diracx/issues/302)
- [doctest](https://github.com/DIRACGrid/diracx/issues/141)
- [Changelog PR](https://github.com/DIRACGrid/diracx/issues/685)
- see my latest comment
- [CLI tests](https://github.com/DIRACGrid/diracx/pull/104)
- oldest PR in diracx. [name=Chris] will ressurect it later.
- [Refactor apply_*_filter to take table instead of column mapping](https://github.com/DIRACGrid/diracx/issues/255)
- [RSS](https://github.com/DIRACGrid/diracx/issues/790)
> Pilot
> diracx-charts
- [Swap the default values of enabled](https://github.com/DIRACGrid/diracx-charts/issues/166)
- [Release notes](https://github.com/DIRACGrid/diracx-charts/issues/237)
> dirac-cwl
- [assigning an output sandbox to a job from the api](https://github.com/DIRACGrid/dirac-cwl/issues/92)
- [dirac-cwl executor tests](https://github.com/DIRACGrid/dirac-cwl/issues/116)
**External deps**
- [Drop boto]: need to be split into smaller issues, and address signurlity issues (add to the gh project)
### [Temporary Section] In progress, predating the new organization
https://github.com/orgs/DIRACGrid/projects/30/views/8
Various people still need to deal with old and staled PRs. We will take them into account in the next sprints.
> diracx
- [feat (JobDB): pydantic datetime validation](https://github.com/DIRACGrid/diracx/pull/477)
- Plan to be processed after LHCb Week (Sprint8: Feb 19th - March 5th)
> DIRAC
- [Summary tables](https://github.com/DIRACGrid/DIRAC/pull/8199)
### External dependencies
https://github.com/orgs/DIRACGrid/projects/30/views/9
---
[Planning Poker](https://en.wikipedia.org/wiki/Planning_poker)
Story points values (based on Fibo)
- `1pt`: Trivial, very clear (small bug fix, config change)
- `2pts`: Small, well understood (small feature, clear requirements)
- `3pts`: Medium, some unknowns (moderate feature)
- `5pts`: Large, significant complexity (major feature, integration)
- `8pts`: Very large, many unknowns (should probably be split)
- `13+pts`: TOO BIG - must split!
- `?`: not enough knowledge to answer (remember it's ok to ask any questions)
## Sprints
### Planning (Velocity and Planning Poker)
- Backlog: https://github.com/orgs/DIRACGrid/projects/30/views/3
- Current Sprint: https://github.com/orgs/DIRACGrid/projects/30/views/1

**Average Velocity: 3.07 x FTEs** *Last update: Jan 21st*
#### :warning: Velocity is a planning tool, not a performance target
- Velocity going down is NOT bad
- Velocity going up is NOT always good (might mean over-estimation)
- Velocity varies sprint-to-sprint
- We track it to improve estimation, not to judge people
**What affects velocity:**
- Estimation accuracy (we're still learning)
- Complexity of work
**Our focus:** Delivering value and hitting commitments, not maximizing velocity numbers.
### March 19th (IN PROGRESS):
#### Target and Context
- Chris & Christophe still working on the foundations (`diracx-tasks`)
- Clean up existing issues/PRs
- Start design of the migration of the RSS
- Make diracx-web stable
#### Availability
- [name=alexandre] 70%
- [name=natthan] 10%
- [name=luisa]
- [name=loris] 80%
- [name=stella] 50%
- [name=jorge]
- [name=ryan]
- [name=federico] %20
- [name=heloise] %40
- [name=christophe] 0%
- [name=chris] 0%
- [name=janusz] 20%
- [name=mazen] 10%
_ FTEs * _ = _ story points
Expected Story Points:
Persons:
Expected Velocity:
#### Sprint Planning:
- Backlog: https://github.com/orgs/DIRACGrid/projects/30/views/3
- Sprint: https://github.com/orgs/DIRACGrid/projects/30/views/1
### March 5th (DONE):
Expected Story Points: 26
Persons: 2.8
Expected Velocity: 9.2
*19 Story Points / 2.8 people = 6.8 velocity*
Comments:
- Less people available during this sprint, but more realistic expectation, we almost reached the expected velocity!!
- LHCb AI hackathon: [name=Alexandre] was much less available than expected.
- Took into account items that were in progress before scrum process (added some SP): resurrecting diracx-web, RSS simplified...
- Closed 2 PRs that were new and made without going through the expected flow (issue -> ddev meeting discussion -> PR)
- Lots of pending PRs, I see 2 issues:
- Reviewing bottleneck: as a reviewer, it's hard to follow the development flow
- Developers pushing their work near the end of the sprint
#### Sprint review: https://github.com/orgs/DIRACGrid/projects/30/views/11
Related to our goals:
- **DIRAC to DiracX transition:**
- More DiracX documentation
- Ed25519 key in place
- DiracX-Web is coming back (still in alpha)
- **CWL integration:**
- **DIRAC maintenance:**
- RSS streamlining
#### Sprint retrospective
*The sprint is a boat :boat: ; we are trying to reach an island (target); identify anchors (what slowed you down), wind (what helped), and rocks ahead (risks for next sprint)*
:warning: **Focus on the process, not people. We're here to improve together! 🚀**
**:anchor: Anchors (what slowed you down)**
- *Example: Unclear requirements on X; Waiting for Y delayed Z; ...*
- Review capacity was limited this week: we could benefit from delegating review responsibilities earlier in this case.
- PRs tended to appear toward the end of the sprint, making it harder to review and merge in time. Spreading submissions more evenly would help.
**:cloud: Wind (what helped)**
- *Example: Good communication in weekly meetings; Quick code reviews; Clear acceptance criteria on user stories; ...*
- We collectively better plan our availability/velocity
- Quick code review: helpful!
**🪨 Rocks (risks for next sprint)**
- *Example: Team member K on vacation; Dependency on external API L; Technical debt in M; ...*
---
### Previous Sprints
#### Summary
- February 19th:
- *38 Story Points / 4.4 people = 8.6 velocity*
- Comments:
- French holidays
- [name=Alexandre] was more available than expected, but did not manage to quickly follow all the PRs.
- A few tasks have been delayed (10 SP): waiting for further discussion on scheduling and diagrams for new LHCb workflows
- Lot of "unplanned" items: expected as long as we have to deal with the large backlog of old items.
- February 5th:
- *29 Story Points / 3.1 people = 9.4 velocity*
- Comments:
- LHCb-CERN had a computing workshop
- Various people worked on old PRs I did not take into account :warning:
- January 21st:
- *6 Story Points / 2.5 people = 2.4 velocity*
- Comments:
- LHCb-CERN had a team retreat, LHCb-Spain had a conference.
- January 7th:
- *15 Story Points / 3.9 people = 3.8 velocity*
- Comments:
- No specific comment, the sprint was split by the holidays.
- December 10th:
- *6 Story Points / 3 people = 2 velocity*
- Comments:
- About the same as the previous sprint: still a gap between expected/actual availability
- November 26th:
- *6 Story Points / 3 people = 2 velocity*
- Comments:
- Much lower than the previous sprint because it included tasks started before the sprint.
- Lots of "almost done" PRs: we are improving the description of the tasks and their size but still not enough (each task should bring value though).
- November 10th:
- *22 Story Points / 4.3 people = 5.1 velocity*
#### Actionable Results from the Retrospective
- **Action:** Better view of the PRs ready to be reviewed vs needing changes.
- Owner: developers
- When: Sprint8
- Status: 19/02/26 In Progress
- **Action:** Better communicate when a PR is going to be big, as soon as possible. Split the work in this case.
- Owner: developers
- When: Sprint6
- Status: 21/01/26 DONE
- **Action:** Better use of the mattermost channel to get reviews on a given PR
- Owner: everyone
- By when: Sprint3
- Status: 04/02/26 DONE
- **Action:** Define estimates and velocity based on Sprint2's results, taking into account external contributions (bonus Story Points) and availability
- Owner: alexandre
- By when: Sprint3
- Status: DONE
- **Action:** Better define the scrum roles
- Owner: alexandre
- By when: Sprint5
- Status: DONE
- **Action:** Better define `DONE` criteria (what should be included into the PR, and how to make sure we are not introducing too much technical debt)
- Owner: everyone
- By when: Sprint2
- Status: DONE
- **Action:** Avoid planning dependent tasks in a same sprint
- Owner: everyone
- By when: Sprint2
- Status: DONE
## AOB