Choose timezone
Your profile timezone:
-gas systems contact for ATLAS -> Paolo to communicate to Davide
-1233zd will be used during LS3 -> TICKET to find a stable and reliable way for injecting in the mixture
-TGC rack 63 and 67 test at double flow before end of Run3 -> TICKET -> meeting with TGC to define plan
-TGC CO2 envelop real leak to check -> TICKET
-for all LS3 activities define time needed and preferred period, then get in touch with ATLAS TC to agree on the time slot
-MDT humidity measurement different between supply to the detector from MDT humidifier and gas analysis chain -> TICKET
-summarize pipe work for ATLAS new pipe installation. One excel file. -> TICKET -> Davide
-TRT/TFC decommissioning meeting with Anatoli & Kostia(s) -> TICKET -> Davide