High-energy booster instrumentation follow-up

→ Europe/Zurich
Zoom Meeting ID
63324041068
Host
Antoine Chance
Useful links
Join via phone
Zoom URL

Antoine Chance reminds the two previous meetings:

·        24/03/2026: https://indico.cern.ch/event/1663811/.

·        22/04/2026: https://indico.cern.ch/event/1675282/.

The main conclusion of the meeting of the 22 April is the need to define the requirements for different operation modes like commissioning and set-up, top-up operation (injection, accumulation, ramp, flat-top and extraction) and polarized beam. A document is under preparation and should be finalized on 25 May 2026. The link to edit the document is:

https://www.overleaf.com/project/69ef7239e7c88dece9be4c44/invite/token/acae5ce743299dfb6a589b88c4d2fad6700a1d968129f158

The strategy is to define the running scenarios and specify the requirements for that. Case examples:

·        For the polarimeter, we may need only during commissioning/set-up and not during operation. That may relax the constraints on the collider because no beam is colliding at this moment.

·        Should we use beam loss monitors (BLMs) in the arcs during operation? That has a large impact on cost and the need for BLMs should be discussed with machine protection people. BLMs are probably mainly useful for debugging during commissioning and using the BLMs of the collider may be sufficient. We should check if high-level losses in the booster can be measured with the collider BLMs. The discussion also focuses on the need to study and implement beam loss monitoring systems to identify where beam losses occur, especially in the context of the booster and main rings. Thibault Lefevre highlights the importance of understanding crosstalk between the booster and main rings, as losses in one can affect measurements in the other. Machine protection is prioritized, particularly for the collider, due to higher beam currents.

 

Everybody agrees on the need to clarify next steps for the design of these systems, suggesting that a dedicated discussion during the FCC Week could help identify key topics, such as running scenarios and system impacts, to guide future work. The goal is to collect existing functional specifications and address open questions, like those related to beam loss and polarimeters, in a document.

The deadline to edit this document has been fixed at 26th of May. That lets a bit of time to use is as basis for discussions at FCC week. There will be a dedicated session to the booster on Thursday.

 

The last version of the booster lattice has been required and be found here: https://gitlab.cern.ch/acc-models/fcc/fcc-ee-heb/-/tree/V26.1_inner_side?ref_type=heads.

 

The next meeting to follow-up the progress is Thursday 26th of May at 9h30.: https://indico.cern.ch/event/1684072/.

There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      Follow-up of instrumentation 20m
    • 09:50 → 10:10
      AOB 20m