Thermosiphon meeting

→ Europe/Zurich
298/1-003 (CERN)

298/1-003

CERN

10
Show room on map
Michele Battistin (CERN)
    • 14:00 → 14:10
      Electrical installation 10m
      Diagramme unifilaire for cabling (Anders). Budget and planning for SX1 Hezemeyer installation (Anders) Budget for SDX1-SX1-Chiller cabling (René) Diesel update (Wislaw).
      Speakers: Anders Andersen (CERN), Rene Necca (CERN), Wieslaw Iwanski (CERN)
    • 15:00 → 15:10
      Brine pipe technical specification 10m
      DO for the supply and installation of connection piping between Brine pumps and C3F8 condenser.
      Speaker: Jose Antonio Botelho Direito (CERN)
    • 15:10 → 15:20
      Pipe Insulation 10m
      Extension of the Ouvaroff contract for the insulation of the C3F8 pipe: + insulation of C6F14 pipe + insulation of the brine pumps skid
      Speaker: Daniel Lefils (CERN)
    • 15:20 → 15:30
      Pipe supports 10m
      Status report on the pipe support installation of the C3F8 pipe.
      Speaker: Daniel Lefils (CERN)
    • 15:30 → 15:45
      Functional Analysis of Water and Brine circuits 15m
      Speaker: Lukasz Zwalinski (CERN)
    • 15:45 → 16:00
      Condenser level meter solution 15m
      Contact with HBM company and Suisse scale supplier.
      Speakers: Lukasz Zwalinski (CERN), Stephane Berry (CERN)
    • 16:00 → 16:10
      Any Other Business 10m