CRU meeting
### General
* Focal has the hardware for the pads (data concentrator, 2 lpGBT on one PCB)
* clock recovery is OK
* next step data sanity checks
* A box of CRU not working, about 5 boards
* TPC (minipod communication issue)
* TRD, pon issue
* 2 general use (opical link issue)
* Serial flash problem (we do not use this anymore)
* Also a parallel flash issue (TPC usage)
### Specification
* OK for circulation
* For now in gitlab cru-fw
* Olivier open a directory, PiPPo load the figures, and we create the PDF
### lpGBT issues, when in TTC clock
* no FEC errors, but error in data !!
* Many checks everywhere, PiPPO sees no issues
* No problem in constant pattern, but there are in counter and PRBS
* legacy GBT, with TTC tree, works in lab
* lpGBT with mockup fails
* RX calibration fails on TTC PON sometimes 5 times in row
* IC configuration
* The FEC error monitor is in a dedicated branch (#422), we need to merge in develop ASAP
* Thus Erno can use it as well (rebase on develop needed)
* We do more test to understand better what is going on
* In july a new TB for Focal, more extensive
* ** We need to double chk firmware test with a LTU test**
* lpGBT IC not working even in local
* see Erno' email from 20 april 2026
* Now with lpGBT V2 and new hardware it is not working at all => live in meeting, seems to be I2C hardware
TODO:
* Bring specification in gitlab (Olivier, and Pippo for figure), build PDF and distribute it to alice-cru
* Rebase 422 and merge (PiPPo)
* See how many CRU can be salvaged from the box in Alex's office and the TPC CRU
* Use same base for FOCAL TB (request to use EP2) => Erno
* Gather more information with LTU usage (PiPPo and Erno)