ISOLDE Technical Coordination Meeting (LS3)

Europe/Zurich
508/1-001 (CERN)

508/1-001

CERN

20
Show room on map
Zoom Meeting ID
62093336977
Host
Joachim Vollaire
Useful links
Join via phone
Zoom URL
    • 14:00 14:05
      General news - Review of minutes 5m

      (JV) - Construction of temporary access road to B. 197/508 for the TG CONS project (21,22 et 25 may). Reserved to vehicles involved in technical activities and deliveries. Expect that access will not be possible during those 3 days. Situation back to normal expected in July (regular road).

      Speakers: Erwin Siesling (CERN), Hanne Heylen (CERN), Joachim Vollaire (CERN)
    • 14:05 14:15
      Safety matters 10m
      Speakers: Hanne Heylen (CERN), James Devine (CERN), Joachim Vollaire (CERN)

      There was an evacuation alarm in the target area and in the hall Monday 4/5 which is likely due to dust when making some core drilling from outside the target area to make the “niche” for the new camera. A IS37 was in place to inhibit the fire detection but for some reasons it was not in force and effective.

      Some of the users present in the hall went to b. 508 instead of the assembly point.

      Reminder to :

      1. If the evacuation alarm sounds or if instructed to do so by an Emergency Guide, leave the building using the nearest and safest exit route.
      2. Walk quickly and calmly to the designated assembly area.
      3. Remain at the assembly area  until instructed to leave by the TSO or Fire and Rescue Service personnel.
      4. Do not re-enter the building until informed that it is safe to do so by the TSO or Fire and Rescue Service personnel.

       

    • 14:15 14:20
      IBDRS and Ventilation primary areas upgrade 5m
      Speakers: Ana-Paula Bernardes (CERN), Joachim Vollaire (CERN), Melania Averna (CERN)
    • 14:20 14:25
      RILIS Laboratory upgrade project - activities update 5m
      Speakers: Carlotta Porzio (CERN), Katerina Chrysalidis (CERN), Laura Lambert (CERN), Sebastian Rothe (CERN)
      • Scaffolding
        • Modifications to current scaffolding around light structure this morning
      • ACE / HE
        • Green I-beams removed - finished yesterday
        • Light structure started and should be finished by latest end of day tomorrow
      • EN / EL
        •  Removed newly accessible cables inside lab as well as end caps on remaining cables below barrack by BI rack
      • SCE / HE
        • Planned date for start is week 21
      • AOB / safety
        • Fire extinguisher by HRS door
          • See photo for current vs new placement
        •  Lead
          • Finish removal this week (hopefully tomorrow)
        • Al bar with old switches attached to mystery tank has been cut
        • Balisage
          • Requested for month of May for dismantling works of RILIS in parking for IBDRS
    • 14:45 14:50
      Mechanical Workshop and other support requests 5m
      Speaker: Oscar Fjeld (CERN)

      Last week:

      • Miniball modification and installation of module on cryo setup
      • Multipack frame dismounted
      • Preparation for carrotage HRS
      • COLLAPSE machining job 
      • Offer painting of ISOLDE logo 199
      • Contact for anchorage new logos

       

      This week:

      • Cleaning out electrical workshop 
      • COLLAPS machining job
      • Move and package the TAS tapestation
    • 14:50 14:55
      Planned visits and AOBs 5m
      Speaker: Hanne Heylen (CERN)

      Visits

      Date/time Name Numbers Guides
      06/05/2026 14:00 LLF 2026 05 03 26 Arthur, Peter
      06/05/2026 15:00 LLF 2026 05 03 26 Carlotta
      08/05/2026 10:00 BASE-HHU Student Visit 11 Liss
      08/05/2026 11:15 Czech Actors 10 Michael

      AOB

      • Route einstein next to b. 133 - circulation alternee 11/05- 22/05
      • Intervention to turn sector valve where ISOLDE ends and COLLAPS start next to COLLAPS before installation of pilar for RILIS (before end of June) -> agree on moment (not at moment where a visit is planned)
      • Should we add MEDICIS back into the agenda of the meeting now operations have restarted? Especially when restriction is over at the end of the month.