Choose timezone
Your profile timezone:
Meeting took place on Zoom
present
IT) Jose
ATS) Nikos / Thomas/ Enzo
Status of ATS-IT cloud POC:
Thomas, presented the PSO at ATS-IT meeting the May 26th.
Cloud CCR Control Planes have been updated to be aligned with production on MCR and PCR. (26/05/2026).
Jose is gathering all images for KBS and Hypervisor. He will start to deploy in 513 nodes and check if a secondary IP range systems for VM.
Enzo need to cleanup 3x of the test CCR nodes and check which nodes can be freed up with Thomas.
Next steps:
Enzo need to check with Vincent to get the right VM service IP configuration on the next activated KBS racks!
Meeting end at 11:13