    • 08:00 08:20
      Pedro Andrade 20m
      WP1.2 (0) WP1.7 (0) WP1.8 (12) - ETICS preparation for RF deployment tests - update of the deployment test tool for RF - upgrade and maintenance of the deployment testing infrastructure running RF services - execution and monitoring of deployment testing for integration build 0.3.0 - participation in release Beta weekly phone meeting (3, 24, 31) WP3.1 (1) - DILIGENT "data challenges" monitoring - monitoring of the certification activity on UNIBAS PPS site WP4.2 (2) - meeting about the coming dissemination events - preparation of an abstract to participate in the EGEE07 demo session - demo preparation for GRID07 and EGEE07 - OGF21 participation discussion WP4.3 (0) Other (1,5) - supervision and support of Katia's work - discussion and planning of D4Science DoW - meeting about usage of the CERN Dashboard by DILIGENT Holidays (6.5) - from 9 to 17 Last Update - 31 Aug
    • 08:20 08:40
      Roberta Faggian Marque 20m
      DILIGENT WP1.8 - follow-up of integration activity for release final - integration and testing phone meetings: Aug 3, - follow-up deployment testing bugs submission for SAs - discussion about future ETICS support WP3.1 - follow-up of summer student experimentation WP4.2 - EGEE07 preparation: booth booking, abstract for booklet - European information Space event organisation: invitations, projects, etc. EGEE-RPLO - meetings - revision of infosheets - PEB meeting - collection of information about FP7 EGEE-III proposals - EGEE07 preparation: collection of achievements pages, programme revision, meeting - RPLO track organisation: EGEE and RP session organisation + new proposals EGE/RP - personnel planning - preparation of new proposals and GPFs - ETICS-2 and D4Science support
    • 08:40 09:00
      Rolandas Naujikas 20m
      Rolandas Naujikas 08, 2007 Major work for BalticGrid; major changes in workplan ---------------------------------------------------------------- SAM maintenance. Added support for Gaussian group in Gamess VO on VU-MIF-LCG2 SGI supercomputer. Analysis of problems with Gaussian group. Limited success for Gaussian usage. VOMS server, hosting litgrid/gamess VO, upgraded and moved to another host. Major rework on maui configuration to improve SGI supercomputer usage. Upgrade of VU-MIF-LCG2 (including core services). Major work for CERN; major changes in workplan ---------------------------------------------------------------- Upgrades in CERN_PPS. Managing CERN's WMS/RBs (for 3 weeks). Major issues arising -------------------- FCR tool is not yet released - managing exclude file by hand. 2 sites (SU-LCG2, VGTU-gLite) suspended from production temporary. Major events attended (include links to event/presentation) --------------------- None Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- None Holidays during the period ------------------------------------------------------------ 1 day TimeSheet for the month ------------------------------------------------------------ NA2: 0% NA3: 30% SA1: Task2: Core central grid services: 20% Task5: User support system: 10% Task7: Logging and accounting system: 10% Task8: Validation and certification of production sites: 30% Infrastructure status ------------------------------------------------------------ 26 sites in project 12 sites contributing to the EGEE production infrastructure 978 cpus (average) 48TB of SE
    • 09:00 09:20
      Dusan Vudragovic 20m
      Dusan Vudragovic August, 2007 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- - SEE-GRID contribution for Chapter 7 of the EGEE-II deliverable DSA1.5: Grid Operations Cookbook http://indico.cern.ch/conferenceDisplay.py?confId=21635 - Preparing description of WiatG further development plan http://indico.cern.ch/conferenceDisplay.py?confId=20695 - Tutorial about Tomcat SSL-integration and DN-based authentication for Web Authentication and Authorization (T8) as a chapter of SEE-GRID Gridification Guide http://wiki.egee-see.org/index.php/SG_Gridification_Guide http://wiki.egee-see.org/index.php/Simple_Tomcat-SSL_integration_and_DN-based_authentication - Preparation of SEE-GRID YAIM RPMs customization (glite-yaim-seegrid version 1.0.1-2 and 1.0.2-1 for glite-yaim-core 3.1.1-8 and 3.1.1-9) http://wiki.egee-see.org/index.php/SG_GLITE-3_Guide http://glite.phy.bg.ac.yu/GLITE-3/yaim/ - SEE-GRID SAM supporter - SEE-GRID helpdesk activities This month I wrote SEE-GRID contribution for Chapter 7 of the EGEE-II deliverable DSA1.5: Grid Operations Cookbook (http://indico.cern.ch/conferenceDisplay.py?confId=21635) and sent it to SEE-GRID mailing list, collected comments and implemented some of them. This chapter is intended to be a summary of the experience and knowledge gained during the building of the regional projects' grid infrastructures. The document is intended to explain some decisions and choices made during planning, deploying, and operating infrastructure. I prepared WiatG further development for phone conference regarding monitoring tools http://indico.cern.ch/conferenceDisplay.py?confId=20695 WiatG further development will be concentrated on following things: BDII web service, sBDII web service, new organization of BDII/sBDII, HGSM (SEE-GRID analogue to GOCDB) web service, Web Applications for visualization of these web services, Alarm dashboard. A part from this, relationship between BDII->GOCDB updates and Downtime Notification automation was discussed at the meeting. I wrote tutorial about Tomcat-SSL integration and DN-based authentication for Web Authentication and Authorization (T8) as a chapter of SEE-GRID Gridification Guide http://wiki.egee-see.org/index.php/SG_Gridification_Guide http://wiki.egee-see.org/index.php/Simple_Tomcat-SSL_integration_and_DN-based_authentication This is a detailed and simple description of Tomcat SSL-integration and DN-based authentication without installing any of middleware components. This can be very useful to those who want to create web applications under Tomcat which will be used by different users that should have different access permissions to various structural parts of the application (just the specific roles or users can see/change parts of the application). Together with AEGIS01-PHY-SCL team I prepared SEE-GRID YAIM RPMs customization. Now all SEE-GRID YAIM customizations can be easily installed on all nodes through the glite-yaim-seegrid RPM. This is described and recommended in the SEE-GRID gLite-3 Guide http://wiki.egee-see.org/index.php/SG_GLITE-3_Guide In the future the customization will be available as RPM for each new release of glite-yaim-core package and for now RPMs are available at http://glite.phy.bg.ac.yu/GLITE-3/yaim/. A part from this, I was occupied with standard SEE-GRID operational activities. Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- - Preparing evaluation of my work at CERN http://indico.cern.ch/conferenceDisplay.py?confId=21636 - ROC on Duty for one week (July 30-August 3) - List of tickets that should be discussed at August 2 Morning meeting http://egee-docs.web.cern.ch/egee-docs/ROC_CERN/CERN-PROD_tickets/CERN-tickets-20070801.xls This month I wrote evaluation of my work at CERN which is available together with final version of document at http://indico.cern.ch/conferenceDisplay.py?confId=21636. I prepared list of week's CERN-PROD tickets to be discussed at August 2 Morning meeting (http://egee-docs.web.cern.ch/egee-docs/ROC_CERN/CERN-PROD_tickets/CERN-tickets-20070801.xls). Beside that I spent one week working as operator on duty at ROC CERN. Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- - WLCG-OSG-EGEE Operations meeting (July 30) http://indico.cern.ch/conferenceDisplay.py?confId=19531 - Morning meeting (August 2) - SAM weekly meetings - IT-GD-OPS weekly meetings Beside weekly SAM and IT-GS-OPS meetings I attended WLCG-OSG-EGEE Operations meeting on July 30 (http://indico.cern.ch/conferenceDisplay.py?confId=19531) and August 2 Morning meeting. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- For the next month I have in plan to attend SEE-GRID PSC meeting which will be held in Thessalonica. Holidays during the period ------------------------------------------------------------ No holidays TimeSheet for the month ------------------------------------------------------------ WP3 A3.1 100% Infrastructure status ------------------------------------------------------------ 30 of sites in project 12 of sites contributing to the EGEE production infrastructure 1005 of cpus 24.4TB total SE
    • 09:20 10:20
      Konstantin Skaburskas
      Konstantin Skaburskas August, 2007, month 20 Major work for Health-e-Child; major changes in workplan ---------------------------------------------------------------- WP5/T5.2 15% (1-9 M) (13-30 M) - Commented on HeC's input to "EGEE07 Projects Achievements Booklet" for EGEE'07 conference. - Preparation of HeC presentation for "CoreGrid Summer School 2007, Budapest, Hungary, 3-7 September, 2007." WP5/T5.6 30% (13-30 M) - gLite Production Updates 32, 33 applied on core services and at sites CERN[1,2]-Geneva-CH - Due to the fact that I did not have time to replace gLite-CEs with LCG-CEs on HeC infra I had to debug problems with BLAHP on gLite-CEs. blahpd doesn't return to gridmanager a job id of a job submitted to LRMS. WP5/T5.7 00% (18-30 M) - WP5/T5.8 00% (18-30 M) - WP5/T5.9 20% (13-30 M) - Helped with gridification of a service which is part of HeC G/W. New service should allow to offload the HeC G/W from the necessity to generate thumbnails of large DICOM files. Now this will be done on grid CEs. WP5 Deliverable 5.1 - 15% (M 18) “Report on the delivered prototype Grid Platform (PDI and grid interfaces to gLite services)” WP14/T14.1 00% (13-30 M) - WP14/T14.2 15% (13-30 M) - Virtual Machine where SAM instance for HeC was installed got problems with file system. Investigated. Till now I was not able to repaire the file system. Apparently reinstallation will be required. Now SAM on HeC is not working. WP14/T14.5 00% (18-30 M) - WP14/T14.6 00% (18-30 M) - WP14/T14.7 00% (18-30 M) - WP14 Deliverable 14.1 - 05% (M 18) “Report on the status of the Platform deployment in PP and PROD environments” Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- (GD-OPS) - GMOD backup: 20-27 Aug - GMOD: 27 Aug - 3 Sept - PPS gLite Update 38 * new WMSLB (codebase gLite 3.1 for 3.0 gLite PPS release) installed from scratch. - updated/submitted a number of bug reports (GD-SAM) - got assigned 3 SAM bugs to work on. By now provided a solution to one of them. (GD-ITR) - helped ITR testers to debug jobs submission to OSG sites in PPS. Major issues arising -------------------- - Major events attended (include links to event/presentation) --------------------- - Synchronization meeting (after vacations) with WP5 and WP14 members from Maat. CERN, 23 Aug 2007. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- - CoreGrid Summer School 2007, Budapest, Hungary, 3-7 September, 2007. Registered as tutor and will attend 5-7 Sept. with presentation about HeC. Holidays during the period ------------------------------------------------------------ * days (1 - 17 Aug) 13 *TimeSheet for the month *20* ------------------------------------------------------------ WP5/T5.1 --% (1-6 M) DoWI WP5/T5.2 15% (1-9 M) (13-30 M) WP5/T5.3 --% (7-12 M) DoWI WP5/T5.4 --% (10-15 M) DoWI WP5/T5.5 --% (16-18 M) DoWI WP5/T5.6 30% (13-30 M) WP5/T5.7 00% (18-30 M) WP5/T5.8 00% (18-30 M) WP5/T5.9 20% (13-30 M) -- WP5 D5.1 15% (M 18) WP14/T14.1 00% (13-30 M) WP14/T14.2 15% (13-30 M) WP14/T14.3 --% (18-30 M) CERN 0% WP14/T14.4 --% (13-30 M) CERN 0% WP14/T14.5 00% (18-30 M) WP14/T14.6 00% (18-30 M) WP14/T14.7 00% (18-30 M) WP14/T14.8 --% (18-30 M) CERN 0% WP14/T14.9 --% (18-30 M) CERN 0% -- WP14 D14.1 05% (M 18)
    • 10:20 10:40
      Florida Estrella 20m
      Health-e-Child Review D5.1, comments sent to Jerome, Konstantin, WP5 mail list Review D6.1, comments sent to Dmitry Review D14.1, comments sent to Jordie, WP14 m.l. Review/comment of HeC-EGEE07 booklet contribution Review/Comment on HeC 6thQR, sent to David, Antonella, comments on WP5,WP14 SEE-GRID Ongoing GPF completion, checking with Svet, Angela; Valia Preparation 5QR, technical & financial reports, missing Dusan July AoM https://edms.cern.ch/file/862341/1/SEEGRID2-WP1-GR-013-Financial-a-2007-08-01_CERN.xls https://edms.cern.ch/file/862341/1/SEEGRID2-WP1-GR-057-5th3MReport-a-2007-08-01_CERN_v3.doc Review revised JRA1 (ex JRA1+JRA2) Review SEE-GRID-2 1st review recommendation replies. All OK. CERN will lead DSA1.1a Dusan's PJAS renewal started, waiting for confirmation fr Aleksandar GPF v2 sent to Valia, waiting for final A31, 30.08 EGI-DS Ongoing GPF completion, checking with Jurgen; Magdalena Version 230807 checked see \Departments\IT\Projects\FP7\Projects\EGI_DS\Proposal\GPF\EGI_DS_230807.GPF EUChinaGrid2 Review of Evolution document. Wrong numbers from Lanxin, already checked EUChinaGrid2 proposal and budget summary sent to Frederic, Bob, Ian, including PM proposal 30.08. waiting for Frederic to confirm CERN participation to Federico. EUMedGrid Contribution to the EGEE07 Booklet, via Domenico, sent to Federico, Federica Review PARv1.7 minor comment to add Frederic to PMB list Updated proposal/budget sent to Frederic, Bob, waiting for budget confirmation fr Federico Updated budget proposel sent to Frederic, Bob, Ian 30.08, waiting for Frederic to confirm CERN participation to Federico. EGEE-II Review DSA1 Intro and COnclusion chapters, feedback sent to John Update EGEE-RP interaction table with information from 5th QR Extract RP interaction from QR5, saved here \Departments\IT\Projects\FP6\Projects\EGEE-II\RPLO\Documents\EGEE-II-QR-highlighted BalticGrid Participation in PMB 17 Aug, minutes http://indico.cern.ch/getFile.py/access?resId=minutes&materialId=minutes&confId=20089 BG2 EVO meeting 20 Aug Completion of the 7th CC, timesheets May-Jun-Jul07 updated, CC file updated, waiting for Dita files are here: \Departments\IT\Projects\FP6\Projects\EGEE\EUProposals_march2005\BalticGRID\Activity_Documents\Finance\CC\P2\BG-ICC-R1Q7-partnerCERN.xls \Departments\IT\Projects\FP6\Projects\EGEE\EUProposals_march2005\BalticGRID\Activity_Documents\Finance\Timesheets\CERN_Timesheet_P2.xls password bg7icc to inger http://indico.cern.ch/conferenceDisplay.py?confId=20179 Comments BG2 WP2 sent to Zofia, at G:\Departments\IT\Projects\FP7\Projects\BalticGrid2\Proposal\WP2_v0.2_FE.doc Comments BG2 JRA sent to Norbert, at G:\Departments\IT\Projects\FP7\Projects\BalticGrid2\Proposal\JRA_description_2007-08-21_FE.doc Comments BG2 NA3 sent to Algimantas, at G:\Departments\IT\Projects\FP7\Projects\BalticGrid2\Proposal\BG2_NA3v0r1_FE.doc generic GPF sent to Per Oster Updated proposal/budget sent to Frederic, Bob, Ian for comments 28.08. Frederic confirmed to Per already. BalticGrid2 PM distribution sent to Frederic, Bob, Ian 30.08. Waiting for PM distribution ok. EELA Review WP2 PoW until end of project, PoW sent by Diego RP-LO Booklet support Update FP7-call1 projects with LoS info: fullname, description, in collaboration with egee, contactperson
    • 10:40 11:00
      Alexandre Duarte 20m
      Alexandre Duarte August, 2007 Major work for EELA; major changes in workplan ---------------------------------------------------------------- * SAM Maintenance * EELA Grid Operation * Re-writing JRA1 for the new EELA 2 proposal * Re-writing TSA1.3 for the new EELA 2 proposal * Participation in the WP2 Workshop Major work for GD-OPS major changes in workplan ---------------------------------------------------------------- * ROC on Duty ( from the 6th to the 9th of August) * Working on the Certification of the UFRJ site. Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- Weekly SAM Team Meetings and Section Meetings EGEE WLCG-OSG-EGEE Operations Meetings (6th of August) WP2 Workshop from 20 to 24th of August (http://indico.eu-eela.org/conferenceDisplay.py?confId=104) Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 7 days TimeSheet for the month ------------------------------------------------------------ WP2/T2.1 30% WP2/T2.3.1 30% WP2/T2.3.2 20% Wp4/T4.2: 20% Infrastructure status ------------------------------------------------------------ # of sites in project - 16 # of cpus - 1668 total SE 62.5 TB ************************************************************
    • 11:00 11:20
      Lanxin Ma 20m
      Lanxin Ma Augest. 2007 Major work for ; major changes in workplan ---------------------------------------------------------------- 1. Cerified a new site SDU-LCG2 in EUChina VO and in Dteam VO. The site shows "OK" status in EUChina SAM monitoring. The following errors were fixed during the certification. - EUChina voms server host certificates were missing - The site info was missing in the top BDII (lcg007.ihep.ac.cn) in IHEP since the top BDII in IHEP did not upgrade. This caused CE test failure. Because the BDII_HOST in the site point to lcg007.ihep.ac.cn - Fixed sync data problem between SAM and Euchina top BDII so that the site appeared in SAM monitoring. - The site published wrongly because of wrong longitude and latitude configuration. - in EUChina SAM client, GFAL was re-pointed to euchina top BDII(euchina-bdii-1.cern.ch:2170) 2. Support the new site SDU-LCG2 - Guided the new site to register at the EUChianGrid ticket system - Guided them how to deal with tickets - Asked an admin of ticket system add the new site into ticket system in order to send ticket to the new site 3. EUChianGrid Grid operation - infrastructure support activity - submit tickets - process tickets 4. Infrastructure trubelshooting:investicate & solve EUChina sites problem CA update in CYFRONET-LCG2, BEIJING-CNIC, INFN-CATANIA, GR-01-AUTH CE problem in CYFRONET-IA64, BEIJING-CNIC, BEIJING_IHEP SE problem in CYFRONET-LCG2 5. Fixed CVS check out configuraiton error in EUChina SAM client for dteam VO. 6. Participated a Grid workshop in IHEP Major work for ; major changes in workplan --------------------------------------------------------------- 1. VOMRS maintenance & troubleshooting in LCG production server 2. VOMRS user support, Process user's requests, problems & tickets 3. Update CERN_ROC SAM client(sam-sensor-1.2.4, sam-sensor-1.30-1) on lxb2086 4. Tested new version CA 1.16-1 following GGUS #25588 5. Fixed a WMSLB configuration error for CERN_ROC glite-WMS server according to savannan bug #20667 6. manange and mataince the SAM submission chain for CERN ROC 7. Setup new SAM submission for PPS uncertified sites of all regions for dteam vo. 8. PPS top level BDII maintance & weekly PPS_upgrade to certify the version software 9. Installed tomcat5.5 with SLC4. But it failed when starting tomcat5.5. The reason is being inverstigating. 10. Participated in EMT meeting to discuss about new version VOMS/VOMRS test status. Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- IT-GD-OPS weekly meeting EMT meeting Grid workshop in IHEP Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 2 days TimeSheet for the month ------------------------------------------------------------ WP3/A3.3 100% Infrastructure status ------------------------------------------------------------ 11 of sites in project 11 of sites contributing to the EGEE production infrastructure 1667 of total cpus (Gstat) total SE: 12 total CE: 11 total RB: 7 total FTS: 0 total LFC: 1 total Local LFC: 1 total GridICE: 11 ************************************************************
    • 11:20 11:40
      Domenico Vicinanza 20m
      Domenico Vicinanza August, 2007 Major work for EUMEDGRID; major changes in workplan ---------------------------------------------------------------- - SAM Server maintainance (working on the server side for scheduled maintenance): -- Installing SAM server (as backup) on Scientific Linux 4 -- problem with BDII2Oracle execution fixed (new sites were not correctly discovered). -- fixed webservice connection between SAM server and SAM client - Upgrade of SAM client (with backups) to be compliant with CA update 1.16 - Troubleshooting for the Algerian site (se01.grid.arn.dz) for failing SE tests - Contributed to Chapter 7 of the EGEE deliverable "The Infrastructure Planning Guide" (the Cook-book) - Report on CMSSW installation and testing guide, final version on http://cern.ch/vicinanz/cmssweumed - Support to EUMED siteadmins to help fixing site configuration problems to install CMSSW software Major work for GD-OPS; GD-ITR; major changes in workplan ---------------------------------------------------------------- - Prepared for the first year Induction interview - SAM Test integration: -- Continued ATLAS Experiment test integration: preparation of a testing environment to allow ATLAS people to safely launch tests and publish results on a development database -- Continued the development, started within EUMED WP3 activities, of the notification tool for site admins. Customized frequency of the alarms, added inline options. The tool is in production for ALICE, it is going to be deployed within ATLAS and LHCb soon. -- Finished integration of LHCb tests (basically complex tests doing software installation/validation), now in production - SAM Documentation: -- Finished SAM server installation guide for SLC4. - SAM Support (GGUS) Major events attended (include links to event/presentation) ---------------------------------------------------------------- - SAM Team and IT-GD-OPS weekly meetings Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------ Holidays during the period ------------------------------------------------------------ 11 day TimeSheet for the month ------------------------------------------------------------ WP3/A3.2 and 3.3 60% WP4/A4.2 and 4.3 40% Infrastructure status ------------------------------------------------------------ # of sites in project: 12 (10 Countries, 8 Mediterranean Countries) # of sites contributing to the EGEE production infrastructure: 5 # of CPUs: 720 (120 CPUs are in gLite CEs) total SE: 9 total CE: 12 total gCE: 9 total RB: 6 total gRB: 2 total FTS: 0 total LFC: 1 total Local LFC: 0 ************************************************************
    • 11:40 12:00
      Marc Ozonne 20m
      ICEAGE * CSC07 Do the latest changes to the slides Prepare the working environment for the Grid practicals with the IT administrator of the school Run the gLite and GT4 exercises on the school's IT infrastructure. Fri 24 - Fri 31 Test all the exercises on site Give support to the students during the different practical sessions Update the Grid track web site with the news *GRID IN A BOX Many meetings with Paulo to supervise his work 2 meeting with Omer Khalid (EGEE SA3) for the installation and use of Vgrid on our nodes *OTHER Test the beta version of the gLite WMS 3.1