Present : A. Chance, B. Delena, Y. Dutheil, S. Kostoglou, P. Lersnimitthum, S. Yue
Booster layout
question of the survey
not presently available will be added by Antoine on the repo Can be added easily by Antoine some time in the next few days (done here) Sofia : the reference is for the IP is GHC reviewing of the V24, with alcove for the generators for 26.2
booster line will cross collider, at 1m above for V24, the approach was to remove dipoles and on 26,
the dipoles have the same field as in the arc do we have a limit on the dipole field max (GDR) placement of the beamshtralung dump at 500m downstream the IP, integration show 5m width but height not known. now 3 magnets per half-cell against 2 for V24 Question : can we shift the injection point more upstream ?
Other question is do we need to move the injection point upstream Antoine estimates dropping dipoles at the start of the arc is possible. When we have the correct circumference : Antoine can try to fit the space needed for injection Sofia will do the survey of the collider and Antoine the survey of the booster, Yann&Sen to share injection design requirements Question : can the straight section length be increased ?
This is constrained by the offset at the IP and the arc offset to the collider. Also follows the collider, and reference circumference Could the start-of-arc dipole strength increased ? This is indeed one possibility Question of the second straight ?
Another straight is present further downstream, around 1200m from the IP -> injection would be extended by about 400m Advantage of being very far from the experiment Next step
Sharing of the collider and Booster survey for V26, Antoine preparing this that evening Antoine will make a commit on the injection repo for the injection Beam Extraction and dump
Booster placement in the technical straight sections remain in question Presently 26cm outside of the collider center Cell length may change, but the same strategy as V24 should be applicable. Agreement to conduct a more detailed implementation once the booster optics and placement will be more fixed