LEP3/FCCee Injector discussion

Europe/Zurich
Follow-up points:
  • Andrea to continue the simulations through the full ramp to 45 GeV, and to add the geometric to normalized emittance conversion so results are directly comparable to the collider ring target.
  • Andrea and Pantaleo to share the resulting bunch spacing and parameter table. 
  • Simone to check with the RF group (Peauger and colleagues) on the feasibility of a 20 to 25 microsecond linac macropulse and the associated modulator requirements.
  • Simone to check with W. Bartmann on the minimum practical branching angle for a new transfer line off the existing beam lines at low energy, relevant to the Plan A site option.
  • Elias has taking the role of the accelerator studies WP and will start contacting  Pantaleo, Andrea, and Simone, while Edda is on leave for the following two weeks (return expected Wednesday 19th).
There are minutes attached to this event. Show them.