ICL Meeting ISOLDE complex
Actions from last meeting:
IBDRS
EN-CV - SCE: intégration carottage et piping
Scan fosse GPS
EN-AA task: Integration of safety routing and fire detection
Some shielding blocks under discussion and scan should be done
Visit planned week 29: Ana Paula, Vincent, Steven, Julien
RILIS
Finalisation de la plateforme
Shielding, wall and corner to modify: interferences
Re-routing of some services need to be discussed with EN-EL
- BI Rack topic under evaluation: ECR to be modified
Visit should be done to clarify this point
To be added on ECR plateform
- CV piping need to be clarified with a visit on site
Scan will be shared
EN-EL should be informed about scan and retro engineering (Laura organised meeting)
Platform CHRIS / COLLAPS
New BC open to continue the integration work
Access platform under evaluation
Table of design sharing to create with responsible for each design office
REXEBIS
Global integration updated
First proposal of transport and installation under study and realisation - V.Barozier update the position and diameter, SCE makes the proposal
Some update on going for size and position
UPDATE:
Scan of the niche
838 area placed in the 3401 coordinate system, with high definition scan of the niches (thanks Alban)
Johan updated the Civil Engineering model.