Vac pipe removal

Europe/Zurich
Zoom Meeting ID
67874081171
Host
Laura Lambert
Useful links
Join via phone
Zoom URL
  • Kati to follow up on emailing Daniel and Eduardo re: flange issue
  • Plan:
    • concrete pouring
    • Scaffolding to go up in GPS and HRS immediately after
    • GPS scaffolding can be a close of what was done for carrotages
    • HRS scaffolding, meeting on site needed
    • Cutting and decontamination of pipes with GDES can happen immediately after scaffolding is up
    • Then aim for welding and re-installation / re-routing of pipes end of sept by Daniel
  • Laura to make tkt for scaffolding and set-up on-site visit for HRS
There are minutes attached to this event. Show them.
The agenda of this meeting is empty