logbook summary
Despite some delays due to issues in the PS, the LHC was filled with 12 bunches of various emittances (2×4 μm, 2×3 μm, 4×2 μm, 4×1 μm) and was ready for beam size measurements around 20:00. We collected data for approximately 50 minutes at flat bottom from all scanners available on Beam 1 (5 systems), triggered sequentially while stepping the HV control of the photomultipliers to later determine optimal settings.
During the ramp to 4 GeV, we triggered the scanners manually one by one while observing the BLM display. No warnings were reported by the BLM at this point. We resumed data collection at flat top around 21:10, where the scanners reached 30 to 36% of the beam losses—still well below the limits. We again ramped the HV of the photomultipliers to collect data for later processing, then observed the signal shape on the various scanners in more detail while continuing data collection until midnight.
Overall, we managed to complete our program and collect significant data from the prototype and the other scanners, with a cumulative total of 650 scans (160 for the prototype).
We now have a list of studies to perform with these data to optimize the operation of this new prototype. With more than 160 cycles without hiccups, the availability of this new system was excellent, giving us confidence in consolidating the wire scanner with this system.
Awaiting offline data analysis plus additional data collection during high-intensity tests to observe how the new scanner behaves in terms of absorber heating and carbon wire integrity.