3 meetings to prepare annual meeting:
+Today: Sorting, DA and optics
+Sept 2nd afternoon?: WP2/4/5
+Sept 8th: WP2/Detectors
New meeting series LMC + HL-TCC -> HLMC on Friday morning
News:
+SPS' instabilities at 2.3e11 ppb fully fixed with fine control of longitudinal emittance blow-up.
+BGI in SPS acquired some first good data
+Data from IT string being acquired: Flux jump, voltage spikes and PC response to a fault. To be analyzed. No major concern (a large voltage spike had negligible current change -> Need better modeling).
+LPC yesterday (Sofia presented, Nicolas et al attended): ID800 chamber issue raised- ongoing discussions to decide radius. Need of non-colliding bunches to be clarified, they would need like 6 months. Experiments want to know crossing angle reduction. LHCb requested that filling schemes do not change often.
Medium term goal: Have a first draft in 6 months of new baseline and alternatives