7–11 May 2012
Danfords Hotel & Marina
EST timezone

Session

Session 1

8 May 2012, 09:30
Danfords Hotel & Marina

Danfords Hotel & Marina

Port Jefferson, New York, USA

Conveners

Session 1

  • Alireza Nassiri (Argonne National Laboratory - DOE)
  • Francis PEREZ (CELLS)

Presentation materials

There are no materials yet.

  1. Mr James Rose (Brookhaven)
    08/05/2012, 09:30
    Oral
    The NSLS-II is a third generation 3 GeV light source designed for 500mA of circulating current and up to 1.2 MW of installed RF power. The RF systems consist of a 200 MeV S-band pulsed LINAC, 90 kW IOT based transmitter powering a 7 cell cavity for the booster and up to four 500 MHz SRF systems and two 1500MHz SRF passive cavities in the storage ring distributed equally in two RF straight...
    Go to contribution page
  2. Aditya Goel (B)
    08/05/2012, 10:00
    Oral
    The National Synchrotron Light Source consists of an x-ray ring operating with 300mA stored beam at 2.8 GeV and a UV ring with 1 ampere of stored beam at 800 MeV and a shared injector linac and booster. It has been in operation since 1979. The RF systems at this facility cover a wide variety of RF technologies from high power tetrode tube based systems to moderate power solid state devices....
    Go to contribution page
  3. Richard Nelson (Jefferson Lab)
    08/05/2012, 11:00
    Oral
    Eighty RF positions are being added to the existing 340 as part of an energy doubling upgrade at Jefferson Lab. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is completely revamped because of increased power capabilities, yet needed to fit into an existing footprint. This paper will discuss the main components of...
    Go to contribution page
  4. Cristina Pasotti (Sincrotrone Triest S.C.p.A.)
    08/05/2012, 11:30
    Oral
    A review of the ELETTRA Storage Ring and Full Energy Injector 500 MHz RF power plants ( klystron and IOT sources) is described as well as their performances and maintenance procedure. An introduction on RF power projects and future installations is given
    Go to contribution page
  5. Morten Jensen (D)
    08/05/2012, 12:00
    Oral
    We present here a selection of results and some of the major upgrades specific to the high power amplifiers.
    Go to contribution page
Building timetable...