Higher-harmonic RF system (800 MHz) for LHC

→ Europe/Zurich
874/1-011 (CERN)

874/1-011

CERN

75
Show room on map
Zoom Meeting ID
63634906041
Host
Heiko Damerau
Useful links
Join via phone
Zoom URL

Present: S. Albright, A. Back (remote), P. Bampis (remote), D. Barrientos, A. Butterworth, R. Calaga, O. Capatina, J. Casanova Alberich, S. Lauber (remote), N. Catalan Lasheras, H. Damerau, A. Edwards, S. Gorgi Zadeh, A. Grudiev (remote), C. Hain, G. Hagmann, P. Hickersberger (remote), W. Hofle, B. Karlsen-Baeck, I. Karpov, A. Kyriakidou, A. Lasheen, A. Macpherson (remote), M. Neroni, F. Peauger, S. Pitman, H. Pommerenke, G. Rosaz (remote), H. Timko, L. Thiele (remote), K. Turaj, D. Valuch, L. Valle (remote), N. Valverde Alonso, W. Venturini

Introduction (Heiko Damerau)

  • Beam measurements during Run 3 combined with semi-analytical calculations (MELODY) and tracking simulations (BLonD) show that the HL-LHC beam parameters are at the limit of longitudinal stability.
  • Bunch flattening or, more generally, shaping the longitudinal bunch distribution has been shown to be effective as a mitigation during an MD, but it is uncertain if it will also work in the HL-era.
  • A higher-harmonic RF system at 800 MHz provides, together with the fundamental 400 MHz RF system, a double-harmonic configuration, which largely improves stability due to the increased synchrotron frequency spread.
  • Following initial ideas in the early 2000s, a dedicated design effort for an 800 MHz RF system for the LHC took place from 2013 to 2015, but it was decided in 2014 to stop the activities, as there was no compelling case at that time.
  • With the refined theoretical studies and beam measurements it became evident that the combination of broad- and narrowband impedance can be detrimental, and hence the 800 MHz idea as an ultimate option to cure longitudinal instability has been revived.
  • Guiding questions for the meeting
    • Updated beam physics understanding and arguments, based on 2026 beam measurements?
      • Refined impedance model for theoretical studies?
      • Required RF voltage (number of cavities) for stabilization?
    • What is the starting point for the design?
    • What changed with respect to the 2013-2015 design and constraints?
    • How to prepare a decision on 800 MHz for LHC in 2030/31? What is missing?

HL-LHC impedance model update (Michela Neroni)

  • Recent beam measurements indicate a 70% higher broadband impedance than expected from the previous impedance model.
  • The simplified broadband impedance model for Run 3 ('lhc_pywit_model') assumed an effective broadband impedance of Im(Z/n) ≈ 0.07 Ohm and a cutoff frequency of 5 GHz (originally 50 GHz in the impedance model for transverse simulations). Recent additions to the longitudinal impedance model when moving from LHC to HL-LHC lead to an expected increase of the effective broadband impedance by only 3 to 4 mOhm, which would be negligible. While a cutoff frequency of 5 GHz (corresponding to the first TM mode of the beam screen at 5.3 GHz) has been taken, the lowest cutoff frequency of the beam screen's TE mode is about 3.6 GHz (confirmed by measurements). In reality, different elements have different cutoff frequencies, and each should be modelled separately.
  • A realistic simulation model for one full 400 MHz RF cryomodule has been built, including four cavities with HOM couplers, unshielded bellows and tapers, which completely revises the impedance. The broadband contribution of an 800 MHz cryomodule with two cavities per beam would be of the order of 1.72 mOhm (including bellows). Their impact on broadband impedance can hence be neglected.
  • Scaling the LHC design report inductive impedance of 23.7 mOhm to an equivalent broadband resonator with fixed cutoff frequency at 5 GHz results in an effective impedance of Im(Z/n) ≈ 16.6 mOhm.
  • All relevant contributors from the design report are being re-evaluated with modern electromagnetic simulation tools: Shielded bellows (ongoing), vacuum valves (ongoing), unshielded bellows (completed), BPMs (to be checked), further BI instruments (to be checked), Y chambers (to be checked).
  • Known missing contributors to longitudinal impedance are the four MKICool kicker magnets as well as the Roman Pots. Together they contribute 7.2 mOhm (worst case: 15 mOhm). Further elements are the tripled BOMs (to be checked), the eight ADT kickers per beam (ongoing), the kickers and septa (to be checked), collimator impedance (refinement ongoing).
  • The installations during LS4 (four linear beam wire scanners (BWS), unshielded bellows at IPs, four high-bandwidth BPMs for the CC feedback, aC coating in arcs and triplets) are expected to add about 1.8 mOhm altogether.
  • Discussion
    • Only about 10% additional broadband impedance has been identified, but there is a large gap with respect to the missing 70%. The contribution of the MKICool magnets and Roman Pots is not sufficient.
    • Either important impedance contributors are missing in the model, or the cutoff frequency is incorrect.
    • The original broadband impedance from the LHC Technical Design Report was rather pessimistic for the known contributors. This somewhat compensated for the missing elements.

Longitudinal stability in the (HL-)LHC (Ivan Karpov)

  • Loss of Landau damping (LLD) was initially observed during the ramp in 2010, and later undamped oscillations with single bunches were seen to produce beam losses below HL intensity. The destabilizing effect of broadband impedance in combination with resonant impedance sources was found to strongly impact the threshold of longitudinal coupled-bunch instability (CBI).
  • The instability thresholds observed in measurements are much lower than in simulations. Two types of independent measurements show the same results:
    1. Beam measurements of the longitudinal response to a fast phase kick. 
    2. Detailed measurements of intensity-dependent longitudinal Schottky spectra.
  • The accuracy of instability threshold predictions is limited by several factors, and macro-particle simulations are essential.
  • The injected bunch distributions, different from bunch to bunch, are not matched to the RF bucket in the LHC, causing initial dipole and quadrupole oscillations, which can trigger an instability. The beam feedback loops introduce unwanted batch-by-batch coupling at each injection. Additionally, further effects like Intra-Beam Scattering (IBS) and RF noise cause uncontrolled longitudinal emittance blow-up.
  • For combined LLD and coupled-bunch simulations, there was a first effort to identify the minimal configuration that has to be modeled in simulations. One or two bunch trains may be sufficient. However, even under these conditions an order of magnitude is still missing in the time span modeled. In 2026 MDs, the onset of CBI was observed after several seconds only. IBS moreover starts to matter when, e.g., the growth time is of the order of 10 s (there are limitations as the IBS model only works for Gaussian distributions).
  • Thresholds of CBI were probed with beam in 2026 using the 400 MHz RF system as well-defined impedance source with respect to the revolution frequency harmonic components of the beam, with decreased RF feedback gain, intentional cavity detuning, and one-turn feedback disabled. This configuration is estimated to well represent the main HOM impedance of the DQW crab cavities. Only one MD was performed with trains at HL-LHC parameters and 6 out of 25 cases exhibited instability.
  • Several mitigation techniques are being considered to suppress the CBI. They are based on either longer bunches or bunches with a flattened bunch distribution. The latter substantially change the sensitivity to instability. Bunch flattening can be achieved by multiple techniques.
    • Excitation by RF phase modulation is applied routinely in the LHC to stretch bunches at the flat-top. This limits beam-induced heating and counteracts synchrotron radiation damping.
    • Bunch flattening (to the right degree) was also demonstrated during the 2026 LHC MD, using a band-limited blow-up in the SPS. While the longitudinal emittance is marginally affected, the bunch length of the flat-topped bunches increases. As predicted, a stabilization of these flat-topped bunches stored for about 30 minutes was observed, but available statistics are limited from just one MD in the LHC.
    • Injecting bunches into the LHC with its RF system adjusted to a higher loaded quality factor could be considered, combined with the phase-modulated SPS-LHC transfer. With more than 10 MV at injection (compared to only 8 MV used with phase modulated transfer), the longitudinal emittance from the SPS could be increased accordingly. Potential disadvantages are that such a scheme would only work together with the phase-modulated capture (due to insufficient RF power otherwise). It furthermore requires producing and transferring longer bunches to maintain the baseline bunch length after filamentation in the LHC.
    • A higher-harmonic RF system at 800 MHz is very efficient to stabilize the beam.
  • In summary, there are difficulties with predictions from simulations, due to an insufficient accuracy of the (HL-)LHC longitudinal impedance model as well as due to limited computing power to track a large number of highly resolved bunches for a long time. Possible mitigation measures against CBI are bunch flattening, higher voltage at injection (potentially combined with a higher loaded quality factor at injection and phase-modulated capture) or a higher-harmonic RF system at 800 MHz.
  • Discussion
    • A longitudinal damper loop, equivalent to the transverse feedback could be foreseen. This was already part of the initial design of the LHC, but then descoped. 
    • Active damping of the prominent HOM in the DQW crab cavities could be considered as an alternative, but it is most likely technically very difficult with an SRF system.
    • Future studies to be performed
      • Speed up the tracking simulations and include more intensity effects to improve the accuracy of their predictions.
      • Develop the scenario for a complete operational cycle with a high-harmonic RF system at 800 MHz.
      • Re-evaluate beam losses during the injection with 10-12 MV capture voltage.
      • Test bunch flattening in the SPS in early 2029, including phase modulation with the 800 MHz RF system in the SPS.

800 MHz recap (Rama Calaga)

  • The LHC is the only high-intensity accelerator at CERN which is operated with only a single-harmonic RF system. PSB, PS and SPS all profit from the additional stability in a  double-harmonic RF configuration.
  • Motivation at that time was three-fold: (i) bunch shaping, (ii) increased beam stability for protons, and (iii) decreased de-bunching for ions. A maximum voltage of 4 MV for the 800 MHz system was considered sufficient for stabilization at injection (50% of the principal RF system), while 8 MV would have been required at flat-top (again assuming a comfortable 50% of the 400 MHz RF system).
  • The cavity design (including the CST model) from the efforts in 2013-2015 is available. Tunability was a major guiding parameter, as down-scaling 400 MHz would result in a too stiff cavity. Hence a design with a beam pipe diameter of 150 mm was chosen. It is a compromise for HOM damping, RF voltage, and it fits with the 100 mm aperture required in the LHC.
  • An HOM damping scheme based on LHC-type HOM couplers (narrow-band and broadband couplers) was developed. Detailed HOM coupler simulations were done in 2013-2015 (for LHC-type HOM couplers). Alternative HOM couplers were considered, but they turned out to be not very practical.
  • Calculations for 1.6 MV voltage per cavity (in bunch-shortening mode) result in 65-82 kW average generator forward power. Hence about 150 kW per cavity would be required to reach 2 MV in cavity (using phase modulation as in the principal 400 MHz system). Twice that power (300 kW) would be needed per cavity in the half-detuning scheme.
  • The fundamental power coupler can be set to fixed coupling factor (50 Ohm), the coupler could be a slightly modified version of the existing SPL couplers. The latter are a priori compatible in terms of power level and frequency range.
  • As RF power sources in the required range, IOTs as for the SPS 800 MHz RF system could be used. Alternatively a solid-state amplifier solution could be considered.
  • From the integration point of view, the system would consist of a 2-cavity cryomodule per beam, about 2.5 m long. With the present space reservation, one 800 MHz system would need to be located in S34 and the other one in S45. This configuration has disadvantages for power amplifiers (two installation locations), but advantages for cryogenic heat load, as S34 and S45 have separate cryogenic plants.
    • Based on the well-known heat-load of the 400 MHz (ACS) cryomodules (340 W for all four cavities), a two-cavity cryomodule at 800 MHz (ACH) can be estimated to cause a heat load of 320 to 440 W at 4.5 K.
  • The proposal of building and installing a cryomodule with two 800 MHz cavities in the SPS (profiting from crab cavity cryomodule test bench) could be feasible in Run 4. It would prepare a full installation in the LHC during LS4. Most optimistically, the installation of a prototype cryomodule in SPS-BA6 in the timeframe of 2030 is not excluded. While the RF design of the cavity and ancillaries is already very advanced (2013-2015 study), an engineering design is now needed to advance.
  • Discussion
    • Design one 800 MHz cryomodule for a beam test in the SPS, but compatible with installation (with some modifications) in the LHC.
    • The next window to install the infrastructure for an 800 MHz RF system in LHC will only be LS4 (also due to modifications to the cryogenic distribution line).
    • While bunch-lengthening and bunch-shortening modes were considered in the 2013-2015 study, only bunch-shortening mode would be considered for the new development. This substantially reduces the RF power.
    • No design for the LLRF system was made in 2015, but the existing developments based on uTCA hardware and White Rabbit synchronization are a good starting point.

Tunnel integration aspects (Katarzyna Turaj)

  • On each side of LHC P4, a 3.5 m long space is reserved for the 800 MHz system, next to the space reserved for the electron lens (descoped, but reused by other BI projects (BGC)). The space is located between ADT equipment and continues through green doors.
  • A straightforward scenario would be to place only one cryomodule on each side (S34 and S45 sector for cryogenics).
    • From the TE-VSC side, this requires a new sectorization of the vacuum system.
    • Space will be needed in the UL44/UL46 service tunnels for the RF installations. There is no space reservation for RF in that area, the space for ten racks for the (descoped) electron lens could be potentially repurposed.
    • For cryogenics, an additional service module is required on each side, with an estimated cost of about 0.5 MCHF per module for 2 K (and somewhat cheaper for a 4.5 K installation). This service module limits the maximum horizontal size of the cryomodule. As long as the total cryogenic consumption is 100-150 W (4.5 K) per side of the IP, it can be supplied within the present cryogenic capacity. Above that limit, it will need to be studied in more detail. Additionally, experience in 2030 with 2 MV operation of the ACS system will show how much of the margin will remain available.
    • The beam gas curtain (BGC) monitor(s) inject(s) gas at low pressure and could contaminate the 800 MHz system if they stay just next to the cavities. Hence, relocation of the BGC should be considered. For the 400 MHz cavities the potential impact of the BGC was evaluated. Thanks to the physical distance, this was found negligible. Indeed no degradation of the 400 MHz cavities can be related to the operation of the BGC.
  • Discussion
    • As an option, both 800 MHz cryomodules could be installed close to each other, on the same side of the straight section (while moving the BGC as far away as possible). This configuration would only require a single service module for the connection to the cryogenic distribution, but of course the cryo load is then not distributed between two cryogenic plants any more.
    • Points 1 and 5 (as for the crab cavities) are not suited as alternatives, due to the low dispersion required, as well as the vacuum sectorization.
    • In summary, there are no immediate showstoppers for installing two two-cavity 800 MHz cryomodules in point 4. However, one needs to check the needs in terms of space for all services (cooling, LLRF and RF power installations), in view of preparing a space reservation for the LHC 800 MHz RF system.

Ongoing 800 MHz SRF developments (Franck Peauger)

  • The SRF developments at 800 MHz are mainly geared to reach high accelerating gradients and unloaded quality factors for FCC-ee and PERLE, with bulk Nb cavities. For the LHC application as a higher-harmonic cavity these performance parameters are not the main priority, and the focus is more on strong damping of HOMs. The present cavity designs are moreover compatible with Nb3Sn coating, which is being studied in view of the ttbar operation of FCC-ee.
  • Single-cell 800 MHz test cavities are produced at JLAB and CERN. Both designs have different geometries.  The JLAB design features a beam pipe diameter of 130 mm and 90 deg wall angle. The UROS design fabricated at CERN has a beam pipe diameter of 156 mm, and is similar to the 2013-2015 design of the LHC 800 MHz cavity with 150 mm beam pipe diameter (details would need to be looked into). The single-cell test cavities will be sent for surface treatment exploration to the main labs involved in SRF: FNAL, IJCLab, CEA, Cornell, and DESY, HZB, etc.
  • A cavity of the JLAB design was tested at CERN in March 2026 and showed good performance (2 K), reaching an unloaded quality factor beyond 1E10 up to 20 MV/m (after a major weld repair). For comparison, to reach an accelerating voltage of 2 MV required for the LHC 800 MHz RF system the field would be of the order of 5 MV/m, hence one quarter of the achieved electric field.
  • Two cavities of the UROS design are already at FNAL (cavity #1) and IJCLab/CEA (cavity #2) for final processing. The final machining of half cells for cavities #3 to #7 at CERN is in progress. 
  • Discussion
    • The required operational tuning range of the LHC 800 MHz cavities would be about 1.7 kHz for protons and 11.2 kHz for 208Pb82+, twice the corresponding range for the 400 MHz cavities.
    • The design of the end groups (the enlarged beam pipe pieces with fundamental and HOM power couplers) is particularly critical and dominates the effort. As the HOM damping scheme in LHC and FCC-ee is rather different, one cannot easily profit from the RF designs done for FCC.
    • Since the main cost-driving factor is not the design and tooling for the cavity cell itself, but all the rest around, it was recommended to do the RF design for what is really needed for an LHC 800 MHz system (in terms of cavity geometry, tuning sensitivity and range, etc.).

Summary

  • Refine the longitudinal impedance model for HL-LHC as a basis for all calculations and simulations during LS3. Study longitudinal CBI with tracking simulations, using the improved impedance model.
  • Pursue minimum preparation for an 800 MHz higher-harmonic system such that a decision to rapidly launch a project for the LHC can be taken in 2030/31, depending on the beam measurements with HL-LHC.
There are minutes attached to this event. Show them.
    • 13:30 → 13:40
      Introduction (10') 10m

      Guiding questions

      • Updated beam physics understanding and arguments?
      • RF voltage and number of cavities required?
      • Starting point for the design? What is missing with respect to 2015 design?
      • How to prepare a decision for 800 MHz in LHC in 2030/31? What is missing?
    • 13:40 → 14:05
      HL-LHC impedance model update (15'+10') 25m
      • Impedance model based on loss-of-Landau damping measurements
      • Changes pre-/post-LS3
      • Missing impedance
      • Resulting effective impedance
      Speaker: Michela Neroni
    • 14:05 → 14:40
      Longitudinal stability in LHC (20' + 15') 35m
      • Summary of 2026 MD results
      • Projections for HL-LHC parameters
      • Effective impedance (broadband and resonant)
      • Simulation effort for coupled-bunch instabilities
      Speaker: Ivan Karpov (CERN)
    • 14:40 → 15:00
      Discussion buffer (20') 20m
    • 15:00 → 15:20
      Coffee break 20m
    • 15:20 → 15:50
      Previous 800 MHz RF design effort (20'+10') 30m
      • Intended applications and 2015 beam parameter assumptions, number of cavities
      • RF design: cavity, fundamental power coupler, HOM couplers
      • Cryo-module integration
      • RF power source and distribution
      Speaker: Rama Calaga (CERN)
    • 15:50 → 16:10
      Tunnel integration aspects (10'+10') 20m
      • Space reservation
      • QRL connection (jumper, etc.)
      Speaker: Katarzyna Turaj (CERN)
    • 16:10 → 16:30
      Ongoing 800 MHz SRF developments at CERN (10'+10') 20m
      • Test cavities in past decade
      • Developments for FCC
      • Collaboration options for 800 MHz (existing or new)
      Speaker: Franck Peauger (CERN)
    • 16:30 → 17:00
      Discussion 30m