Robotics and Communications for the FCC

→ Europe/Zurich

General Discussion

  • The communications hardware not fully defined
    • Leaky feeder still baseline
    • Wifi in the Alcoves
  • Salvatore is looking into wireless radiation tolerant ATS
  • All fibres will go through a single point (PA)
  • Big question is the reliability requirements of the network and if redundancy is needed?
  • FCC will be the owner of the networks.

 

Ask from Rodrigo:

  • Reliability requirements for the network?
    • Based on functional safety for the robots.
    • Perhaps this requirement should come from the safety team?
  • How many robots operating per cell? 
  • Any info on the comms failures and network switching.
    • MIRA robot had collected some data on this in SPS.

 

Robotic Tasks for Communications

  • Comms surveys (already captured)
  • Potentially some installation tasks.
  • Rodrigo will share our current tasks with his team for feedback.

 

Action Points

  • Robotics team to work with safety to come up with reliability requirements
  • Robotics team to provide estimate of robots per cell
  • Robotics team to share existing tasks
    • Rodrigo to share this with team for feedback.
  • Robotics to share data on the SPS comms survey.
There are minutes attached to this event. Show them.
The agenda of this meeting is empty