ICL Meeting ISOLDE complex
- IBDRS
EN-THE: Mise à jour du tableau d'intégration (Titouan) et mise à jour modèle 3D
EN-CV: Nina in contact with supplier for the ventilation update (B.170 et B.738)
Station de refroidissement des dumps - attente retour de RP pour finaliser intégration
Stefano: Inspection week 39: voir si la trappe peut être modifiée / inspection RP si possible
Ajouter tube de drainage entre le dump et la trappe en zone cible
- RILIS
EN-CV could check the last version for the ventilation distribution
SCE would bring some 3D model update
Update should be done for the access stairs: sharing model with V.Barozier for integration
- COLARIS
EN-ACE: V.Barozier in contact with James for the simulation comparison: james.dilwyn.devine@cern.ch
Check the walkway from isoltrap: see on the 3D scan
EN-CV: asking BC and timeline for this project -> Kara should bring some details (estimation September 2027)
SCE: Tiago should be contacted to bring update on this project