IBDRS water retention system
→
Europe/Zurich
Presents: Ana Paula, Fabio, Alexandre, Joachim, Nina et Stefano
Goal: check the risk to introduce in case of fire water from firebrigade into the ISOLDE target area 838 due to the drain conected in new 738 building.
- the firebrigade extenguisher water is potentially contaminated (low risk) but this risk will increase after LS4 and the relocation of the primaries pumps into nuclear room in 738 building.
- the present solution with the water collection in underground room in 838 is confirmed and validated.
- in case of large volume collection the 250 L pot will be submerged and the excess of water will run into the underground room.
- the underground room has to be tight painted (epoxy resin) :
- dismount the old ventilation pipe
- clean the floor
- paint the walls up to 1,5 high
- paint the floor 16.1 m2
- in case of water into 250 L pot or underground 838, it will be pumped with an immerged pump and transferred in the 170 building decay tanks
- I will organize a meeting with SCE to discuss:
- who will do the paint in underground 838, Nicoletta ?
- planify it
- be sure we have a drain under the rails into the new 737 corridor



There are minutes attached to this event.
Show them.